WELL · 42-391-01159 · DISTRICT 2

O'Connor, Thomas -C- #4G

N

Refugio County  · Vertical

O'Connor, Thomas -C- #4G (API 42-391-01159) is a former disposal or injection well in Refugio County, last operated by Hilcorp Energy Company; its UIC permit is no longer active.

The RRC has issued 10 drilling permits (amended twice) between 1978 and 2026, permitted to 5,980 ft.

Completion filings report 7 formation tops, including Lagarto, Oakville, Catahoula, Anahuac.

Its 4 leases have reported 28M barrels of oil and 19.2M mcf of gas since January 1993, last reporting in July 2026. The leases carry 705 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyJul 22, 2026
5,980
total depth, ft
12
permits on file
Jul 22, 2026
last permit issued
—
completed
28M
cumulative oil, bbl
19.2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 705 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O'Connor, Thomas "C" G-2-267316Tom Oconnor (4200)Hilcorp Energy Company10189Mar 2012 – Jul 2026
Oconnor, Thomas, -C- O-2-2587Tom Oconnor (5500 Sand)Hilcorp Energy Company512.22M2.1MJan 1993 – Jul 2026
O'Connor, Thomas -C- O-2-2876Tom Oconnor (5900 Sand)Hilcorp Energy Company592.99M2.17MJan 1993 – Jul 2026
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 681,261 · prior 12 536,766(+27%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 117,915 · prior 12 84,330(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
917064-99RecompletionHilcorp Energy CompanyJul 8, 2026Jul 22, 2026—5,980
727406-97RecompletionHilcorp Energy CompanyMar 19, 2012Nov 8, 2011Feb 24, 20125,980
727406-98RecompletionHilcorp Energy CompanyFeb 24, 2012Nov 8, 2011—5,980
727406-99RecompletionHilcorp Energy CompanyNov 1, 2011Nov 8, 2011—5,980
634903-99RecompletionHilcorp Energy CompanyMar 8, 2007Mar 15, 2007Apr 13, 20075,980
515806-99RecompletionHilcorp Energy CompanyDec 4, 2001Dec 6, 2001May 10, 20025,980
483197-99RecompletionQuintana Pet. Corp.Mar 10, 1999Apr 6, 1999Feb 11, 19995,980
391689-99RecompletionQuintana Pet. Corp.Sep 6, 1991Nov 19, 1991Oct 4, 19915,980
366774-99RecompletionQuintana Pet. Corp.Nov 21, 1989Jan 10, 1990—5,980
289153-99RecompletionQuintana Pet. Corp.Sep 19, 1985Nov 5, 1985—5,980
254011-99RecompletionQuintana Pet. Corp.Sep 19, 1984Oct 9, 1984—5,980
15357-99RecompletionQuintana Pet. Corp.Jan 3, 1978Jan 3, 1978—5,980

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-267316————
—— O-2-2587————
—— O-2-2587————
—— O-2-2876————
—— O-2-2876————
—— O-2-5280————

Formation tops

As filed on W-2/G-1. Subsea from 55 ft elevation.Download CSV →

FormationMD ftSubsea
LagartoLARGARTO1,500-1,445
LagartoLARGARTO2,750-2,695
Oakville2,750-2,695
CatahoulaCATAHOULA (MIOCENE)3,300-3,245
Oakville3,300-3,245
AnahuacANAHUAC (MIOCENE)4,100-4,045
CatahoulaCATAHOULA (MIOCENE)4,100-4,045
AnahuacANAHUAC (MIOCENE)4,365-4,310
Fri-Greta (Oligocene)4,365-4,310
FrioFRIO-GRETA (OLIGOCENE)4,365-4,310
FrioFRIO-GRETA (OLIG)4,785-4,730
FrioMIDDLE FRIO (SINTON)5,000-4,945
FrioMIDDLE FRIO (SINTON)5,400-5,345
FrioLOWER FRIO (OLIGOCENE)5,880-5,825
Frio5,980-5,925
FrioFRIO DISPOSAL5,980-5,925
FrioLOWER FRIO (OLIG)5,980-5,925
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
4,1204,132Perforated
5,0415,057Perforated
5,1525,165Perforated
5,2235,233Perforated
5,4735,481Perforated
5,4865,490Perforated
5,5185,523Perforated
5,6835,689Perforated
5,7855,790Perforated
5,8005,808Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,23514.75350 S
9.8755,6527750 S
75,9529.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 2026Sep 18, 2026—
00Apr 24, 2013Apr 12, 2012—
00Jun 28, 2007Apr 30, 2007Yes
00Jun 12, 2007——
00Jul 29, 2002May 30, 2002Yes
00Jun 21, 2002——
00May 14, 1999Apr 22, 1999Yes
00May 11, 1999Jan 15, 1992Yes
00Mar 20, 1992Jan 15, 1992Yes
00Mar 30, 1990Jan 24, 1990Yes
00Mar 21, 1990——
00Nov 26, 1985Aug 9, 1985—
00Nov 15, 1985——
00Jan 12, 1984Jan 9, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124883H-1 InjectionNot activated15,0002,2004,450–4,850

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101159, documented in the API reference.