WELL · 42-391-01269 · DISTRICT 2
Lambert M.F. #62
Refugio County · Refugio-Fox (5800) field · Vertical
Lambert M.F. #62 (API 42-391-01269) is a permitted well in Refugio County filed by Pennzoil Exploration & Prod. CO.; no completion report is on file yet.
The RRC has issued one drilling permit, issued May 20, 1993, permitted to 5,750 ft.
Completion filings report 2 formation tops, including 2600 Sd, 5800 Sd.
Operator of record
Pennzoil Exploration & Prod. Co.
Carthage, TX · P-5 Y, filed Mar 22, 2001 · 1,023 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pennzoil Exploration & Prod. Co. |
| Production reports | Pennzenergy Exp. & Prod., L.L.C.through Nov 1999 |
| Latest permit | Pennzoil Exploration & Prod. Co.May 20, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,750
- total depth, ft
- 1
- permits on file
- May 20, 1993
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 659K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lambert, M. F. G-2-146091 | Refugio-Fox (2600) | Hilcorp Energy Company | 1 | 0 | 659K | Jul 1993 – Jul 2026 |
| Lambert, M.F. O-2-4962 | Refugio-Fox (5800) | Pennzoil Exploration & Prod. Co. | 3 | 0 | 0 | Jan 1993 – Aug 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Exploration & Prod. Co.Jul 1993 → Sep 1998
- 2Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Nov 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 411805-99 | Recompletion | Pennzoil Exploration & Prod. Co. | May 17, 1993 | May 20, 1993 | Jul 13, 1993 | 5,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-146091 | — | — | — | — |
| — | — O-2-4962 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 62 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 2600 SD | 2,595 | -2,533 |
| 5800 SD | 5,862 | -5,800 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,613 | 2,614 | Perforated |
| — | 5,861 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 540 | — | 300 S |
| 7 | 5,872 | — | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 4, 1993 | Aug 2, 1993 | Yes |
| 00 | Aug 13, 1993 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-01269 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-01269 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39101269, documented in the API reference.