WELL · 42-391-01651 · DISTRICT 2

Tom O'Connor (5800'SD)FIELD Unit #C427

N

Refugio County  · Vertical

Tom O'Connor (5800'SD)Field Unit #C427 (API 42-391-01651) is a former disposal or injection well in Refugio County, last operated by Quintana Pet. Corp.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 5,916 ft.

Completion filings report 5 formation tops, including Lagarto, Oakville, Catahoula, Anahuac.

Its 2 leases have reported 22.8M barrels of oil and 14.9M mcf of gas since January 1993, last reporting in July 2026. The leases carry 599 wells, so these are lease totals, not this well alone.

Operator of record

Quintana Pet. Corp.

Refugio, TX · P-5 Y, filed Jun 9, 2000 · 1,589 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitQuintana Pet. Corp.Nov 19, 1984
5,916
total depth, ft
2
permits on file
Nov 19, 1984
last permit issued
—
completed
22.8M
cumulative oil, bbl
14.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 599 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Jul 2026
Oconnor, Thomas -E- O-2-5000Tom Oconnor (5800)T - C Oil Company500Jan 1993 – Nov 2011

Oil, barrels lease total

Last 12 months 673,200 · prior 12 524,408(+28%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 117,526 · prior 12 83,712(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
258120-99RecompletionQuintana Pet. Corp.Nov 9, 1984Nov 19, 1984—5,916
218557-99RecompletionCopano CompanyOct 24, 1983Oct 26, 1983—5,915

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-5000————
—— O-2-5280————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
LagartoLARGARTO1,500
Oakville2,750
CatahoulaCATAHOULA (MIOCENE)3,300
AnahuacANAHUAC (MIOCENE)4,100
FrioFRIO-GRETA (OLIGOCENE)4,365
FrioMIDDLE FRIO (SINTON)5,000
FrioLOWER FRIO (OLIGOCENE)5,880

Perforations

Perforated and open-hole intervals.

FromToType
5,8405,852Perforated
—5,898Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,03315475 S
5.55,9059.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 28, 1985Feb 5, 1985—
00Feb 20, 1985——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
6.05M
bbl, all reported
Sep 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000051628H-1 InjectionPlugged Mar 27, 20036,0001,5005,840–5,851

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120012002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101651, documented in the API reference.