WELL · 42-391-01719 · DISTRICT 2

Nordan L. A.-Oconnor Thomas Est. #13

N

Refugio County · Tom Oconnor (5900 Sand) field  · Vertical

Nordan L. A.-Oconnor Thomas Est. #13 (API 42-391-01719) is a permitted well in Refugio County filed by Nordan & Company; no completion report is on file yet.

The RRC has issued one drilling permit, issued June 29, 1978, permitted to 5,924 ft.

It was permitted by Nordan & Company and has since transferred to T-C Oil Company LLC on the wellbore schedule.

Completion filings report one formation top, including No Change.

Its 2 leases have reported 22.8M barrels of oil and 14.9M mcf of gas since January 1993, last reporting in July 2026. The leases carry 595 wells, so these are lease totals, not this well alone.

Operator of record

T-C Oil Company LLC

Permitted by Nordan & Company; the EWA schedule now lists a different operator.

Refugio, TX · P-5 Y, filed Oct 4, 2025 · 287 permits on file · (361) 646-9296

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleT-C Oil Company LLC
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitNordan & CompanyJun 29, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,924
total depth, ft
1
permits on file
Jun 29, 1978
last permit issued
—
completed
22.8M
cumulative oil, bbl
14.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 595 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tom Oconnor (5800 SD) Fld. Unit O-2-5280Tom Oconnor (5800)Hilcorp Energy Company59422.8M14.9MJan 1993 – Jul 2026
Nordan, L.A., O'Connor, Thos. ES O-2-5627Tom Oconnor (5450 Sand)T - C Oil Company100Jan 1993 – Aug 2007

Oil, barrels lease total

Last 12 months 673,200 · prior 12 524,408(+28%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 117,526 · prior 12 83,712(+40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintana Pet. Corp.Jan 1993 → Nov 2000
  2. 2Hilcorp Energy CompanyDec 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
27600-99RecompletionNordan & CompanyJun 29, 1978Jun 29, 1978—5,924

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-5280————
—— O-2-5627————

Formation tops

As filed on W-2/G-1. Subsea from 50 ft elevation.Download CSV →

FormationMD ftSubsea
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
5,5315,788Perforated
5,8055,811Perforated
5,8155,822Perforated
—5,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,13715528 S
10.751,137—528 S
55,9159.875528 S
55,915—528 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 7, 2008Jul 25, 2007—
00May 25, 1984——
00Jan 12, 1984Sep 22, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39101719, documented in the API reference.