WELL · 42-391-30535 · DISTRICT 2

Lambert M. F. #106

N

Refugio County · Tom Oconnor (5500 Sand) field  · Vertical

Lambert M. F. #106 (API 42-391-30535) is a well in Refugio County operated by Hilcorp Energy Company, completed October 22, 1976.

The RRC has issued 2 drilling permits between 1985 and 1990, permitted to 6,001 ft.

It was permitted by H & D Operating Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including 5425, 5500, 5900.

Its 3 leases have reported 313K barrels of oil and 471K mcf of gas since January 1993, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by H & D Operating Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsKovar Operating, LLCthrough Jul 2019
Latest permitH & D Operating CompanySep 4, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,001
total depth, ft
2
permits on file
Sep 4, 1990
last permit issued
Oct 22, 1976
completed
313K
cumulative oil, bbl
471K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 22, 1976
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lambert, M.F. O-2-6088Tom O'Connor (4150)Hilcorp Energy Company14120K314KJan 1993 – Jul 2026
Lambert , M. F. O-2-6256Tom O'Connor (4150)Hilcorp Energy Company10193K157KJan 1993 – Aug 2021
— O-2-7000——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1H & D Operating CompanyJan 1993 → May 2015
  2. 2Pennzoil Exploration & Prod. Co.Jan 1993 → Feb 1999
  3. 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  4. 4Devon Energy Production Co, L.P.Apr 2000 → Jul 2002
  5. 5Hilcorp Energy CompanyAug 2002 → Aug 2018
  6. 6Kovar Operating, LLCJun 2015 → Jul 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
376282-99RecompletionH & D Operating CompanyAug 6, 1990Sep 4, 1990—6,001
283450-99RecompletionHewit & DoughertyAug 23, 1985Aug 26, 1985—6,001

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-6088————
—— O-2-6256————
—— O-2-7000————

Formation tops

As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →

FormationMD ftSubsea
54255,450-5,385
55005,520-5,455
59005,884-5,819

Perforations

Perforated and open-hole intervals.

FromToType
4,1164,126Perforated
5,4505,454Perforated
5,5385,540Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,22015640 S
76,0009465 S
76,0009.875465 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2021Jul 1, 2021—
00Jul 28, 2021Jul 1, 2021—
00Dec 19, 1990Sep 13, 1990Yes
00Oct 5, 1990Sep 9, 1985—
00Nov 18, 1985Sep 9, 1985—
00Nov 2, 1985——
00Jan 12, 1984Nov 1, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39130535, documented in the API reference.