WELL · 42-391-31264 · DISTRICT 2

Lambert M.F. #111

N

Refugio County · Tom Oconnor (4500 Greta Mass.) field  · Vertical

Lambert M.F. #111 (API 42-391-31264) is a well in Refugio County operated by Hewit & Dougherty, completed August 11, 1978.

The RRC has issued 3 drilling permits between 1978 and 1982, permitted to 4,600 ft.

Completion filings report 2 formation tops, including 4500 Greta Massive, 4150 Sand.

Its 2 leases have reported 313K barrels of oil and 471K mcf of gas since January 1993, last reporting in July 2026. The leases carry 24 wells, so these are lease totals, not this well alone.

Operator of record

Hewit & Dougherty

Refugio, TX · P-5 Y, filed Mar 15, 1990 · 73 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHewit & Dougherty
Production reportsKovar Operating, LLCthrough Jul 2019
Latest permitHewit & DoughertyMar 12, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
3
permits on file
Mar 12, 1982
last permit issued
Aug 11, 1978
completed
313K
cumulative oil, bbl
471K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 11, 1978
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lambert, M.F. O-2-6088Tom O'Connor (4150)Hilcorp Energy Company14120K314KJan 1993 – Jul 2026
Lambert , M. F. O-2-6256Tom O'Connor (4150)Hilcorp Energy Company10193K157KJan 1993 – Aug 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1H & D Operating CompanyJan 1993 → May 2015
  2. 2Pennzoil Exploration & Prod. Co.Jan 1993 → Feb 1999
  3. 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  4. 4Devon Energy Production Co, L.P.Apr 2000 → Jul 2002
  5. 5Hilcorp Energy CompanyAug 2002 → Aug 2018
  6. 6Kovar Operating, LLCJun 2015 → Jul 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
153215-99RecompletionHewit & DoughertyMar 12, 1982Mar 12, 1982—4,600
49991-99RecompletionHewit & DoughertyJun 4, 1979Jun 4, 1979—4,600
26364-99DrillHewit & DoughertyJun 13, 1978Jun 13, 1978Jul 19, 19784,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-6088————
—— O-2-6256————
—— O-2-6256————

Formation tops

As filed on W-2/G-1. Subsea from 66 ft elevation.Download CSV →

FormationMD ftSubsea
4500 Greta Massive4,410-4,344
4150 Sand——

Perforations

Perforated and open-hole intervals.

FromToType
4,1284,132Perforated
4,3884,397Perforated
4,4094,412Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,25713.75525 S
2.3754,035——
2.3754,301——
2.8754,357——
5.54,5998.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2021May 13, 2021—
00Jun 22, 2021May 13, 2021—
00Jan 12, 1984Apr 12, 1982—
00Jan 12, 1984Jun 20, 1979—
00Jan 12, 1984Aug 28, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.