WELL · 42-391-31374 · DISTRICT 2
Hynes Mineral Trust -B- #1
Refugio County · Refugio-Fox (5850) field · Vertical
Hynes Mineral Trust -B- #1 (API 42-391-31374) is a plugged well in Refugio County, plugged May 27, 1993, last operated by J3 Oil CO. Inc..
The RRC has issued 3 drilling permits between 1979 and 1984, permitted to 7,021 ft.
Operator of record
San Antonio, TX · P-5 Y, filed Apr 15, 1985 · 71 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J3 Oil Co. Inc. |
| Production reports | Acock/Anaqua Operating Co., LPthrough Nov 2018 |
| Latest permit | J3 Oil Co., Inc.Dec 31, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,021
- total depth, ft
- 3
- permits on file
- Dec 31, 1984
- last permit issued
- Nov 28, 1979
- completed
- 0
- cumulative oil, bbl
- 421K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 28, 1979
- Shut in
- —
- Plugged
- May 27, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scanio, M "B" G-2-114263 | Refugio-Fox (4900) | Acock/Anaqua Operating Co., LP | 1 | 0 | 421K | Jan 1993 – Dec 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southwest Oil & Land, Inc.Jan 1993 → Mar 1998
- 2Cummins & Walker Oil Co., Inc.Jul 1999 → May 2013
- 3Acock/Anaqua Operating Co., LPMay 2014 → Nov 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 263227-99 | Recompletion | J3 Oil Co., Inc. | Dec 27, 1984 | Dec 31, 1984 | — | 7,021 |
| 99187-99 | Recompletion | J3 Oil Co., Inc. | Nov 14, 1980 | Nov 14, 1980 | — | 7,021 |
| 66514-99 | Drill | J3 Oil Co., Inc. | Dec 11, 1979 | Dec 11, 1979 | — | 7,021 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-114263 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,086 | 3,091 | Perforated |
| 4,912 | 4,915 | Perforated |
| 5,110 | 5,112 | Perforated |
| 5,860 | 5,867 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,409 | 12.25 | 575 S |
| 8.625 | 1,410 | 12.25 | 575 S |
| 2.375 | 5,073 | — | — |
| 2 | 5,771 | — | — |
| 2.375 | 5,786 | — | — |
| 4.5 | 6,708 | 7.875 | 1,310 S |
| 4.5 | 6,709 | 7.875 | 1,310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 1, 1985 | Oct 11, 1984 | — |
| 00 | Jan 14, 1985 | Sep 6, 1984 | — |
| 00 | Jan 12, 1984 | Feb 2, 1981 | — |
| 00 | Jan 12, 1984 | Apr 4, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-31374 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-31374 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39131374, documented in the API reference.