WELL · 42-391-31668 · DISTRICT 2
Churchill Unit #2
Refugio County · LA Rosa North (5800) field · Vertical
Churchill Unit #2 (API 42-391-31668) is a plugged well in Refugio County, plugged July 10, 1995, last operated by Ctr Petroleum Inc..
The RRC has issued 4 drilling permits between 1983 and 1991, permitted to 6,370 ft.
Completion filings report 2 formation tops, including Catahoula, Greta.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed Jun 5, 2015 · 73 permits on file · (361) 947-7218
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CTR Petroleum Inc. |
| Production reports | none |
| Latest permit | CTR Petroleum, Inc.Apr 17, 1991 |
- 6,370
- total depth, ft
- 4
- permits on file
- Apr 17, 1991
- last permit issued
- Mar 14, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 14, 1986
- Shut in
- —
- Plugged
- Jul 10, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Churchill Unit G-2-138681 | LA Rosa, North (3500) | CTR Petroleum, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 1995 |
| — G-2-130998 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 385211-99 | Recompletion | CTR Petroleum, Inc. | Feb 28, 1991 | Apr 17, 1991 | Apr 18, 1991 | 6,370 |
| 358982-99 | Recompletion | CTR Petroleum, Inc. | May 5, 1989 | May 8, 1989 | — | 6,370 |
| 299294-99 | Recompletion | Expando Production Company | Mar 7, 1986 | Mar 11, 1986 | — | 6,370 |
| 213649-99 | Drill | Expando Production Company | Mar 20, 1984 | Sep 21, 1983 | Oct 3, 1983 | 6,370 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-130998 | — | — | — | — |
| — | — G-2-138681 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,534 | 3,542 | Perforated |
| 5,632 | 5,639 | Perforated |
| 5,857 | 5,863 | Perforated |
| 6,268 | 6,272 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,147 | 12.25 | 513 S |
| 4.5 | 6,368 | 7.875 | 694 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 1991 | May 13, 1991 | Yes |
| 00 | Jul 16, 1991 | — | — |
| 00 | Jul 7, 1989 | May 31, 1989 | Yes |
| 00 | Jun 30, 1989 | — | — |
| 00 | Apr 28, 1986 | Mar 19, 1986 | Yes |
| 00 | Apr 5, 1986 | — | — |
| 00 | Jun 25, 1984 | Mar 21, 1984 | — |
| 00 | Jun 14, 1984 | Mar 21, 1984 | — |
| 00 | Feb 24, 1984 | Jan 4, 1984 | — |
| 00 | Jan 31, 1984 | Jan 4, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-391-31668 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-391-31668 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39131668, documented in the API reference.