WELL · 42-391-31868 · DISTRICT 2

Huff Gas Unit 1 #10

N

Refugio County  · Vertical

Huff Gas Unit 1 #10 (API 42-391-31868) is a permitted well in Refugio County filed by Bridge Oil Production CO., Inc.; no completion report is on file yet.

The RRC has issued 6 drilling permits between 1985 and 1992, permitted to 6,050 ft.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.

Operator of record

Bridge Oil Production Co., Inc.

Midland, TX · P-5 Y, filed May 7, 1993 · 97 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsCliffwood Production Co.through May 1997
Latest permitBridge Oil Production Co., Inc.May 7, 1992
6,050
total depth, ft
6
permits on file
May 7, 1992
last permit issued
—
completed
0
cumulative oil, bbl
80.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Huff GU 1 G-2-141410McFaddin (2450)Remora Management, LLC1080.5KJan 1993 – Sep 2011
— G-2-120139——000—
— G-2-134981——000—
— G-2-141070——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Jun 1994
  3. 3Southwest Oil & Land, Inc.Apr 1996 → Nov 1996
  4. 4Cliffwood Production Co.Dec 1996 → May 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398958-99RecompletionBridge Oil Production Co., Inc.May 4, 1992May 7, 1992May 7, 19922,500
397732-99RecompletionBridge Oil Production Co., Inc.Mar 24, 1992Mar 25, 1992Mar 9, 19922,676
369552-99RecompletionTXO Production Corp.Feb 7, 1990Feb 8, 1990—5,812
342666-99RecompletionTXO Production Corp.Feb 16, 1988Feb 24, 1988—5,812
296615-99RecompletionTXO Production Corp.Jan 28, 1986Jan 29, 1986—6,050
279731-99DrillTXO Production Corp.Jul 5, 1985Jul 8, 1985—6,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-120139————
—— G-2-134981————
—— G-2-141070————
—— G-2-141410————

Formation tops

As filed on W-2/G-1. Subsea from 66 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)TOP OF MIOCENE1,900-1,834
FrioTOP OF FRIO4,100-4,034

Perforations

Perforated and open-hole intervals.

FromToType
2,4602,464Perforated
2,5152,518Perforated
2,7962,728Perforated
2,8242,827Perforated
2,8592,864Perforated
2,9002,906Perforated
5,2945,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,48112.25649 S
8.6251,48112.5649 S
2.8755,8127.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 23, 1992May 13, 1992Yes
00Jun 3, 1992——
00May 14, 1992Mar 26, 1992Yes
00Apr 13, 1992——
00Aug 30, 1990May 11, 1990Yes
00Aug 1, 1990——
00Apr 6, 1988Mar 3, 1988—
00Mar 7, 1986Feb 14, 1986Yes
00Mar 4, 1986——
00Nov 1, 1985Aug 5, 1985—
00Oct 18, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39131868, documented in the API reference.