WELL · 42-391-32134 · DISTRICT 2

Welder C #6

Plugged

Refugio County · Phil Power (5200-B) field  · Vertical

Welder C #6 (API 42-391-32134) is a plugged well in Refugio County, plugged July 9, 2015, last operated by Hilcorp Energy Company.

The RRC has issued 3 drilling permits (amended once) between 1996 and 2003, permitted to 6,500 ft.

It was permitted by Wiser Oil Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Frio.

Its 3 leases have reported 21.6K barrels of oil and 600K mcf of gas since May 1996, last reporting in November 2015. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Wiser Oil Company, The; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Feb 2015
Latest permitWiser Oil Company, TheAug 20, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
4
permits on file
Aug 20, 2003
last permit issued
Dec 11, 1998
completed
21.6K
cumulative oil, bbl
600K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Nov 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 11, 1998
Shut in
—
Plugged
Jul 9, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder "C" G-2-198832Phil Power (5050 Frio)Hilcorp Energy Company10229KMay 2002 – Nov 2015
Welder "C" G-2-172720Phil Power (5200-B)Hilcorp Energy Company10309KDec 1998 – Jul 2015
Welder "C" O-2-8179Phil Power (5200)Wiser Oil Company, The121.6K62.4KMay 1996 – Nov 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dale Operating CompanyJun 1996 → Jun 1997
  2. 2Wiser Oil Company, TheJul 1997 → Nov 2005
  3. 3Forest Oil CorporationJun 2006 → Dec 2012
  4. 4Hilcorp Energy CompanyJan 2013 → Feb 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535587-99RecompletionWiser Oil Company, TheAug 20, 2003Aug 20, 2003May 4, 20025,228
482880-99RecompletionWiser Oil Company, TheFeb 22, 1999Feb 26, 1999Dec 9, 19986,360
446659-98DrillDale Operating CompanyJul 18, 1996Apr 4, 1996—6,500
446659-99DrillDale Operating CompanyApr 4, 1996Apr 4, 1996Apr 17, 19966,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-172720————
—— G-2-198832————
—— O-2-8179————

Formation tops

As filed on W-2/G-1. Subsea from 78 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO 5050'5,058-4,980
FrioFRIO 5200 B5,229-5,151

Perforations

Perforated and open-hole intervals.

FromToType
5,0585,065Perforated
5,2295,234Perforated
5,3005,310Perforated
6,1746,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,61112.25510 S
4.52,9697.875850 S
4.56,3387.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2004Nov 19, 2003Yes
00Feb 3, 2004——
00Oct 27, 1999Feb 22, 1999Yes
00May 10, 1999——
00Sep 12, 1996Jul 15, 1996Yes
00Jul 25, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39132134, documented in the API reference.