WELL · 42-391-32452 · DISTRICT 2

O Connor Thomas #14

N

Refugio County · Greta (5800) field  · Vertical

O Connor Thomas #14 (API 42-391-32452) is a well in Refugio County operated by Acock/Anaqua Operating CO. LC, completed January 4, 2002.

The RRC has issued 2 drilling permits between 2001 and 2003, permitted to 6,400 ft.

Completion filings report 5 formation tops, including Catahoula, Greta, Top Of Sinton, Frio.

Its 2 leases have reported 109K barrels of oil and 300K mcf of gas since January 2002, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Acock/Anaqua Operating Co. LC

Corpus Christ, TX · P-5 Y, filed Jan 5, 2007 · 57 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAcock/Anaqua Operating Co. LC
Production reportsGreta Operating Company LLCthrough Apr 2025
Latest permitAcock/Anaqua Operating Co., LCSep 30, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,400
total depth, ft
2
permits on file
Sep 30, 2003
last permit issued
Jan 4, 2002
completed
109K
cumulative oil, bbl
300K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 4, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
O'Connor, Thomas O-2-8827Greta, Deep (5700)Greta Operating Company LLC1101K170KOct 2003 – Jul 2026
O'Connor, Thomas O-2-8684Greta (5800)Acock/Anaqua Operating Co., LC18.19K130KJan 2002 – Apr 2004

Oil, barrels lease total

Last 12 months 0 · prior 12 666(-100%)

0200400202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 32(-100%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Acock Engineering & Assoc., Inc.Jan 2002 → Mar 2002
  2. 2Acock/Anaqua Operating Co., LCApr 2002 → Apr 2004
  3. 3Acock/Anaqua Operating Co., LPMay 2004 → Nov 2020
  4. 4Greta Operating Company LLCDec 2020 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
536955-99RecompletionAcock/Anaqua Operating Co., LCSep 30, 2003Sep 30, 2003Oct 4, 20036,000
515689-99DrillAcock Engineering & Assoc., Inc.Nov 29, 2001Nov 30, 2001Nov 7, 20016,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-8684————
—— O-2-8827————

Formation tops

As filed on W-2/G-1. Subsea from 61 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaTOP OF CATAHOULA3,460-3,399
GretaTOP OF GRETA4,318-4,257
Top of Sinton5,026-4,965
FrioTOP OF BASAL FRIO6,234-6,173
Top of Larosa6,420-6,359

Perforations

Perforated and open-hole intervals.

FromToType
5,6885,700Perforated
5,8015,808Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37534217.590 S
8.6251,43212.25420 S
4.55,9827.875490 S
4.5—7.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2004Oct 15, 2003Yes
00Jan 9, 2004Jan 22, 2002Yes
00May 2, 2002Jan 22, 2002Yes
00Feb 21, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39132452, documented in the API reference.