WELL · 42-391-32859 · DISTRICT 2

Ramirez #1

Plugged

Refugio County · Wildcat field  · Vertical

Ramirez #1 (API 42-391-32859) is a plugged well in Refugio County, plugged September 15, 2008, last operated by Riddle Engineering Corp..

The RRC has issued one drilling permit, issued July 30, 2008, permitted to 6,100 ft.

It was permitted by Riddle Engineering Corp. and has since transferred to Riddle Engineering Corp. on the wellbore schedule.

Operator of record

Riddle Engineering Corp.

Permitted by Riddle Engineering Corp.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRiddle Engineering Corp.Jul 30, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Jul 30, 2008
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 15, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
666326-99DrillRiddle Engineering Corp.Jul 9, 2008Jul 30, 2008Sep 3, 20086,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100738W-14 DisposalCanceled Feb 12, 20195,0001,8903,780–4,140

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39132859, documented in the API reference.