WELL · 42-393-00754 · DISTRICT 10
Wilson David #1
Roberts County · Lips (Morrow) field · Vertical
Wilson David #1 (API 42-393-00754) is a plugged well in Roberts County, plugged April 10, 2006, last operated by Hondo Oil & Gas Company Delaware.
The RRC has issued one drilling permit, issued March 20, 1990, permitted to 10,056 ft.
Completion filings report one formation top, including Cleveland.
Its 2 leases have reported 3.15K barrels of oil and 4.95K mcf of gas since January 1993, last reporting in June 2006.
Operator of record
Hondo Oil & Gas Company Delaware
Roswell, NM · P-5 Y, filed Nov 12, 1992 · 69 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hondo Oil & Gas Company Delaware |
| Production reports | Devon Energy Production Co, L.P.through Mar 2001 |
| Latest permit | Hondo Oil & Gas Company DelawareMar 20, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,056
- total depth, ft
- 1
- permits on file
- Mar 20, 1990
- last permit issued
- Jun 1, 1957
- completed
- 3.15K
- cumulative oil, bbl
- 4.95K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 1957
- Shut in
- —
- Plugged
- Apr 10, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilson, David O-14-6728 | Lips (Cleveland) | Chesapeake Operating, Inc. | 1 | 3.15K | 4.95K | Jan 1993 – Jun 2006 |
| — G-14-22339 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Devon Energy Corporation(nevada)Jan 1993 → Feb 2000
- 2Devon Energy Production Co, L.P.Apr 2000 → Mar 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 371193-99 | Recompletion | Hondo Oil & Gas Company Delaware | Mar 20, 1990 | Mar 20, 1990 | — | 10,056 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-22339 | — | — | — | — |
| — | — O-14-6728 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,819 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| ClevelandCLEVELAND SAND | 7,342 | -4,523 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,342 | 7,364 | Perforated |
| 8,968 | 8,984 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 806 | — | 770 S |
| 8.625 | 3,274 | — | 250 S |
| 5.5 | 9,155 | — | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 1990 | May 24, 1990 | Yes |
| 00 | Jun 29, 1990 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-00754 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-00754 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39300754, documented in the API reference.