WELL · 42-393-20043 · DISTRICT 10

Morrison #3183

N

Roberts County  · Vertical

Morrison #3183 (API 42-393-20043) is a disposal or injection well in Roberts County operated by Davis Operating Company, Inc. under an active UIC permit.

The RRC has issued 2 drilling permits (amended 3 times) between 2009 and 2014, permitted to 9,700 ft.

Completion filings report 6 formation tops, including Douglas, Cleveland, Oswego, 13 Finger Lime.

Its lease has reported 14.8K barrels of oil and 20K mcf of gas since October 2005, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Davis Operating Company, Inc.

Tulsa, OK · P-5 Y, filed Apr 4, 2026 · 57 permits on file · (877) 566-8034

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsDavis Operating Company, Inc.through Nov 2019
Latest permitDavis Operating Company, Inc.Dec 10, 2014
9,700
total depth, ft
5
permits on file
Dec 10, 2014
last permit issued
—
completed
14.8K
cumulative oil, bbl
20K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison O-14-7668Morrison Ranch (Morrow Up. 9470)Davis Operating Company, Inc.914.8K20KOct 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Davis Operating Company, Inc.Dec 2005 → Nov 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
799161-99ReclassDavis Operating Company, Inc.Oct 27, 2014Dec 10, 2014—9,700
685639-96ReenterDavis Operating Company, Inc.Aug 30, 2012Sep 30, 2009Nov 11, 20109,000
685639-97ReenterDavis Operating Company, Inc.Jun 1, 2012Sep 30, 2009Nov 11, 20109,700
685639-98ReenterDavis Operating Company, Inc.Nov 22, 2010Sep 30, 2009Nov 11, 20109,700
685639-99ReenterDavis Operating Company, Inc.Sep 29, 2009Sep 30, 2009Nov 11, 20109,594

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-7668————

Formation tops

As filed on W-2/G-1. Subsea from 2,598 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas6,006-3,408
DouglasDOUGLAS SAND6,153-3,555
ClevelandUPPER CLEVELAND SAND7,578-4,980
Oswego8,220-5,622
13 Finger Lime9,272-6,674
13 Fingers Lime9,272-6,674
MorrowMORROW UP 94709,457-6,859
MorrowMORROW UP.. 94709,457-6,859

Perforations

Perforated and open-hole intervals.

FromToType
9,4579,486Perforated
—8,194Perforated
—9,455Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,72612.25500 S
8.52,72612.25500 S
5.59,7257.875160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 4, 2015Sep 4, 2015—
00Aug 21, 2015Mar 13, 2015Yes
00Oct 31, 2014Jun 14, 2012Yes
00Jan 12, 1984—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
790K
bbl, all reported
May 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108453H-1 InjectionActive2,0002,5009,400–9,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 56,068(-100%)

010K20K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39320043, documented in the API reference.