WELL · 42-393-30233 · DISTRICT 10

Morrison Mary T. Etal M #4

Plugged

Roberts County · Parsell (Morrow Upper) field  · Vertical

Morrison Mary T. Etal M #4 (API 42-393-30233) is a plugged well in Roberts County, plugged February 10, 2014, last operated by Mewbourne Oil Company.

The RRC has issued one drilling permit, issued September 12, 2001, permitted to 11,250 ft.

It was permitted by Amoco Production Company and has since transferred to Mewbourne Oil Company on the wellbore schedule.

Completion filings report 8 formation tops, including Brn Dolo, Doug, Tonk, Kscity.

Operator of record

Mewbourne Oil Company

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed May 4, 2026 · 2,059 permits on file · (903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsBP America Production Companythrough Jul 2013
Latest permitAmoco Production CompanySep 12, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,250
total depth, ft
1
permits on file
Sep 12, 2001
last permit issued
Apr 19, 2001
completed
0
cumulative oil, bbl
811K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 19, 2001
Shut in
—
Plugged
Feb 10, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison, Mary T. Etal -M- G-14-69507Parsell (Morrow, Lower)Mewbourne Oil Company10811KJan 1993 – Dec 2014
Morrison, Mary T. Etal "M" G-14-188378Parsell (Morrow, Upper)Mewbourne Oil Company100Apr 2001 – Feb 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyFeb 1995 → Sep 1997
  3. 3Crescendo Resources, L.P.Oct 1997 → Mar 2000
  4. 4Amoco Production CompanyApr 2000 → Dec 2001
  5. 5BP America Production CompanyJan 2002 → Jul 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513486-99RecompletionAmoco Production CompanySep 10, 2001Sep 12, 2001Nov 10, 200111,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-69507————
—— G-14-188378————

Formation tops

As filed on W-2/G-1. Subsea from 2,540 ft elevation.Download CSV →

FormationMD ftSubsea
BRN Dolo3,515-975
Doug6,156-3,616
Tonk6,918-4,378
Kscity7,384-4,844
Clev7,750-5,210
Morrow9,505-6,965
U Morr SD9,662-7,122
L Morr SD10,800-8,260

Perforations

Perforated and open-hole intervals.

FromToType
9,6659,674Perforated
10,80210,819Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,055111,325 S
8.6252,055—1,325 S
5.511,2467.875670 S
5.511,246—670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 2002Jan 14, 2002—
00Jun 18, 2002Sep 6, 2001—
00May 7, 2002——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39330233, documented in the API reference.