WELL · 42-393-30700 · DISTRICT 10
Christie-Tipps #2025
Roberts County · Red Deer Creek (Granite Wash) field · Temp Abandoned · Vertical
Christie-Tipps #2025 (API 42-393-30700) is a well in Roberts County operated by Lease Holders Acquisitions LLC, completed July 3, 1979 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued April 17, 1979, permitted to 10,470 ft.
It was permitted by Taylor Energy Corporation and has since transferred to Lease Holders Acquisitions LLC on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Lease Holders Acquisitions LLC
Permitted by Taylor Energy Corporation; the EWA schedule now lists a different operator.
Yukon, OK · P-5 Y, filed Apr 4, 2026 · (903) 662-1110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lease Holders Acquisitions LLC |
| Production reports | Amarillo Exploration, Inc.through Oct 2019 |
| Latest permit | Paradox Petroleum CompanyApr 17, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,470
- total depth, ft
- 2
- permits on file
- Apr 17, 1979
- last permit issued
- Jul 3, 1979
- completed
- 0
- cumulative oil, bbl
- 231K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 3, 1979
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Christie-Tipps G-14-83697 | Red Deer Creek (Granite Wash) | Lease Holders Acquisitions LLC | 1 | 0 | 231K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Taylor Energy CorporationJan 1993 → Dec 1996
- 2Athena Energy, Inc.Jan 1997 → Sep 2014
- 3Amarillo Exploration, Inc.Oct 2014 → Oct 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 46578-98 | Field transfer | Taylor Energy Corporation | May 6, 1992 | Apr 17, 1979 | — | 10,470 |
| 46578-99 | Drill | Paradox Petroleum Company | Apr 17, 1979 | Apr 17, 1979 | Apr 21, 1979 | 10,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-83697 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,380 | 10,394 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,958 | 11.625 | 1,800 S |
| 2.375 | 10,347 | — | — |
| 4.5 | 10,458 | 7.625 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 16, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-30700 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-30700 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39330700, documented in the API reference.