WELL · 42-393-30821 · DISTRICT 10

Morrison (8) #2-8

Plugged

Roberts County · Shoenail West (Cherokee) field  · Vertical

Morrison (8) #2-8 (API 42-393-30821) is a plugged well in Roberts County, plugged July 23, 2004, last operated by Macdonald Explorations Inc..

The RRC has issued one drilling permit, issued October 20, 1980, permitted to 9,235 ft.

Completion filings report 11 formation tops, including Brown Dolomite, Douglas, Kansas City, Cleveland.

Its lease has reported 51.2K barrels of oil and 309K mcf of gas since January 1993, last reporting in September 2005. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Macdonald Explorations Inc.

Pampa, TX · P-5 Y, filed May 13, 1983 · 11 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMacdonald Explorations Inc.
Production reportsRaylee Operating Companythrough Jul 2004
Latest permitMacdonald Explorations, Inc.Oct 20, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,235
total depth, ft
1
permits on file
Oct 20, 1980
last permit issued
Dec 21, 1980
completed
51.2K
cumulative oil, bbl
309K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 21, 1980
Shut in
—
Plugged
Jul 23, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison O-14-5847Cats Creek (Cherokee, Lo.)Raylee Operating Company451.2K309KJan 1993 – Sep 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ramco Oil & Gas, Inc.Jan 1993 → Jul 1994
  2. 2Ramco Operating CompanyAug 1994 → Jan 1998
  3. 3Ram Operating, Inc.Feb 1998 → Jun 1999
  4. 4Borderline ProductionJul 1999 → Feb 2000
  5. 5Borderline Operating Corp.Mar 2000 → Dec 2001
  6. 6Moore, Stephen OperatingJan 2002 → Jun 2002
  7. 7Raylee Operating CompanyJul 2002 → Jul 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
96045-99DrillMacdonald Explorations, Inc.Oct 20, 1980Oct 20, 1980Oct 30, 19809,235

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-5847————

Formation tops

As filed on W-2/G-1. Subsea from 2,796 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,502-706
Douglas5,625-2,829
Kansas City6,348-3,552
Cleveland6,938-4,142
Oswego7,142-4,346
Cherokee D7,814-5,018
Cherokee 17,976-5,180
Cherokee 28,071-5,275
AtokaATOKA NOVI LIME8,174-5,378
13 Finger Lime8,307-5,511
MorrowUPPER MORROW8,481-5,685

Perforations

Perforated and open-hole intervals.

FromToType
8,0768,142Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,48012.25700 S
2.8757,904——
5.59,0137.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 1986Jun 9, 1986—
00Jun 19, 1986——
00Jan 12, 1984Jan 27, 1982—
00Jan 12, 1984Jan 15, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39330821, documented in the API reference.