WELL · 42-393-30855 · DISTRICT 10

Morrison #1183

N

Roberts County · Morrison Ranch (Morrow Lo.) field  · Directional

Morrison #1183 (API 42-393-30855) is a well in Roberts County operated by Davis Operating Company Inc., completed April 16, 1981.

The RRC has issued 3 drilling permits (amended once) between 1981 and 2009, permitted to 10,700 ft.

Completion filings report 3 formation tops, including Big Lime, Oswego, Morrow.

Its 3 leases have reported 12.4K barrels of oil and 1.02M mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Davis Operating Company Inc.

Tulsa, OK · P-5 Y, filed Apr 4, 2026 · 57 permits on file · (877) 566-8034

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDavis Operating Company Inc.
Production reportsDavis Operating Company, Inc.through Nov 2015
Latest permitDavis Operating Company, Inc.Jan 29, 2009
10,700
total depth, ft
4
permits on file
Jan 29, 2009
last permit issued
Apr 16, 1981
completed
12.4K
cumulative oil, bbl
1.02M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 16, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison G-14-277220Alpar-Pearson (Brown Dolomite)Davis Operating Company, Inc.100Jun 2013 – Jul 2026
Morrison O-14-7665Morrison Ranch (Oswego 8200)Davis Operating Company, Inc.512.4K68.9KAug 2006 – Jul 2026
Morrison G-14-95864Morrison Ranch (Morrow Lo.)Davis Operating Company, Inc.10952KJan 1993 – Sep 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Davis, William H.Jan 1993 → Apr 1998
  2. 2Davis Operating Company, Inc.May 1998 → Nov 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
677796-98RecompletionDavis Operating Company, Inc.Nov 27, 2012Jan 29, 2009Jan 9, 200910,680
677796-99RecompletionDavis Operating Company, Inc.Jan 26, 2009Jan 29, 2009Jan 9, 200010,000
624830-99RecompletionDavis Operating Company, Inc.Aug 23, 2006Aug 25, 2006Jul 5, 20069,400
113248-99DrillDavis, William H.Mar 3, 1981Mar 3, 1981—10,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-95864————
—— G-14-277220————
—— O-14-7665————

Formation tops

As filed on W-2/G-1. Subsea from 2,517 ft elevation.Download CSV →

FormationMD ftSubsea
Big Lime7,580-5,063
Oswego8,070-5,553
Oswego8,074-5,557
MorrowUPPER MORROW GAS9,467-6,950

Perforations

Perforated and open-hole intervals.

FromToType
3,5303,550Perforated
3,8803,890Perforated
4,5004,510Perforated
4,6704,680Perforated
8,0908,120Perforated
10,44210,450Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,34512.252,000 S
2.87510,578——
5.510,7007.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 14, 2015Oct 13, 2014—
00Jan 29, 2007Aug 22, 2006Yes
00Aug 30, 2006—Yes
00Jan 12, 1984Jul 20, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39330855, documented in the API reference.