WELL · 42-393-31035 · DISTRICT 10

Flowers B #1005

Y

Roberts County · Mendota NW. (Granite Wash) field · Producing  · Vertical

Flowers B #1005 (API 42-393-31035) is a well in Roberts County operated by Mmgl Txph LLC, completed December 12, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 18, 1984, permitted to 10,700 ft.

It was permitted by Pioneer Production Corp. and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Brown Dolomite, Base Heebner, Tonkawa, Lansing-Kansas City.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Pioneer Production Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 10 permits on file · (972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsMmgl Txph, LLCthrough Apr 2026
Latest permitPioneer Production Corp.Oct 18, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,700
total depth, ft
1
permits on file
Oct 18, 1984
last permit issued
Dec 12, 1984
completed
0
cumulative oil, bbl
932K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Flowers B G-14-115296Mendota, NW. (Granite Wash, SW.)Mmgl Txph, LLC10932KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 14,207 · prior 12 14,843(-4%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Seagull Midcon Inc.Jan 1993 → May 1998
  2. 2Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  3. 3Ocean Energy, Inc.Nov 2000 → Aug 2003
  4. 4Devon Louisiana CorporationSep 2003 → Dec 2005
  5. 5Devon Energy Production Co, L.P.Jan 2006 → Jun 2016
  6. 6Tecolote Energy Operating, LLCJul 2016 → Dec 2019
  7. 7Blackbeard Operating, LLCJan 2020 → Sep 2023
  8. 8Mmgl Txph, LLCOct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
255191-99DrillPioneer Production Corp.Oct 16, 1984Oct 18, 1984Nov 7, 198410,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-115296————

Formation tops

As filed on W-2/G-1. Subsea from 2,729 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,014-1,285
Base Heebner6,808-4,079
Tonkawa7,540-4,811
Lansing-Kansas City7,883-5,154
Granite Wash9,010-6,281
Atoka10,352-7,623

Perforations

Perforated and open-hole intervals.

FromToType
9,14810,237Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,73612.251,050 S
5.510,5087.875360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 1985Feb 20, 1985—
00Mar 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331035, documented in the API reference.