WELL · 42-393-31120 · DISTRICT 10

Flowers Unit #1073

Plugged

Roberts County · Clark Martin (Granite Wash) field  · Vertical

Flowers Unit #1073 (API 42-393-31120) is a plugged well in Roberts County, plugged February 6, 2015, last operated by Le Norman Operating LLC.

The RRC has issued one drilling permit, issued July 24, 1987, permitted to 9,400 ft.

It was permitted by Cng Producing Company and has since transferred to Le Norman Operating LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Brown Dolomite, White Dolomite, Douglas, Lansing-Ks City.

Its lease has reported 9.27K barrels of oil and 187K mcf of gas since January 1993, last reporting in November 2017.

Operator of record

LE Norman Operating LLC

Permitted by CNG Producing Company; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Aug 2, 2019 · 372 permits on file · (800) 771-5476

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLE Norman Operating LLC
Production reportsForest Oil Corporationthrough Dec 2010
Latest permitCNG Producing CompanyJul 24, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,400
total depth, ft
1
permits on file
Jul 24, 1987
last permit issued
Oct 19, 1987
completed
9.27K
cumulative oil, bbl
187K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 19, 1987
Shut in
—
Plugged
Feb 6, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Flowers Unit O-14-6523Clark Martin (Granite Wash)LE Norman Operating LLC19.27K187KJan 1993 – Nov 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 13-T Exploration, Inc.Jan 1993 → May 2007
  2. 2Cordillera Texas, L.P.Jun 2007 → Sep 2008
  3. 3Forest Oil CorporationOct 2008 → Oct 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
333470-99DrillCNG Producing CompanyJul 24, 1987Jul 24, 1987—9,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-6523————

Formation tops

As filed on W-2/G-1. Subsea from 2,907 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,834-927
White Dolomite4,140-1,233
Douglas6,710-3,803
Lansing-KS City7,057-4,150
Des Moines7,740-4,833
Granite WashGRANITE WASH "D"8,625-5,718
Granite WashGRANITE WASH "E"8,750-5,843
Granite WashGRANITE WASH "E-3"8,810-5,903
Granite WashGRANITE WASH "F"8,923-6,016
MorrowMORROW SHALE9,196-6,289

Perforations

Perforated and open-hole intervals.

FromToType
8,9348,944Perforated
8,9528,958Perforated
9,0139,025Perforated
9,0389,046Perforated
9,0739,078Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,84712.251,010 S
5.59,4207.875255 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 13, 1988Apr 11, 1988Yes
00Apr 29, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331120, documented in the API reference.