WELL · 42-393-31362 · DISTRICT 10

Mathers Unit #4016U

Y

Roberts County · Gill Ranch (Granite Wash) field · Temp Abandoned  · Vertical

Mathers Unit #4016U (API 42-393-31362) is a well in Roberts County operated by Mmgl Txph LLC, completed August 13, 1997 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits between 1997 and 1998, permitted to 12,100 ft.

It was permitted by Seagull Midcon Inc. and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Brown Dolo., Granite Wash, Morrov, Morrow.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl Txph LLC

Permitted by Seagull Midcon Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 10 permits on file · (972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsBlackbeard Operating, LLCthrough Sep 2023
Latest permitSeagull Midcon Inc.Mar 25, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,100
total depth, ft
2
permits on file
Mar 25, 1998
last permit issued
Aug 13, 1997
completed
0
cumulative oil, bbl
1.86M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 13, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mathers Unit G-14-165012Gill Ranch (Morrow)Mmgl Txph, LLC101.72MAug 1997 – Jul 2026
Mathers Unit G-14-167296Gill Ranch (Granite Wash)Mmgl Txph, LLC10145KAug 1997 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Seagull Midcon Inc.Aug 1997 → May 1998
  2. 2Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  3. 3Ocean Energy, Inc.Nov 2000 → Aug 2003
  4. 4Devon Louisiana CorporationSep 2003 → Dec 2005
  5. 5Devon Energy Production Co, L.P.Jan 2006 → Jun 2016
  6. 6Tecolote Energy Operating, LLCJul 2016 → Dec 2019
  7. 7Blackbeard Operating, LLCJan 2020 → Sep 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
473480-99RecompletionSeagull Midcon Inc.Feb 17, 1998Mar 25, 1998May 14, 199712,100
459023-99DrillSeagull Midcon Inc.Feb 25, 1997Mar 31, 1997May 13, 199712,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-165012————
—— G-14-167296————

Formation tops

As filed on W-2/G-1. Subsea from 2,983 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolo.4,608-1,625
Granite Wash8,708-5,725
Morrov11,728-8,745
Morrow11,728-8,745

Perforations

Perforated and open-hole intervals.

FromToType
11,50011,545Perforated
11,81011,816Perforated
11,83011,836Perforated
11,87611,882Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,22712.252,010 S
5.512,1177.875350 S
5.5—7.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 24, 1998Sep 29, 1997Yes
00Apr 3, 1998——
00Feb 2, 1998Sep 29, 1997Yes
00Nov 3, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331362, documented in the API reference.