WELL · 42-393-31581 · DISTRICT 10
Pioneer #4
Roberts County · Parsell (Morrow Lower) field · Producing · Vertical
Pioneer #4 (API 42-393-31581) is a well in Roberts County operated by BE Anadarko II LLC, completed February 9, 2018 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued August 13, 2003, permitted to 11,500 ft.
It was permitted by Range Production Company and has since transferred to BE Anadarko II LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Douglas, Tonkawa, Atoka, Morrow.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Range Production Company; the EWA schedule now lists a different operator.
Austin, TX · P-5 Y, filed Aug 4, 2025 · 2 permits on file · (405) 264-3283
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BE Anadarko II LLC |
| Production reports | Winright Resources Operating,llcthrough Jan 2022 |
| Latest permit | Range Production CompanyAug 13, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 1
- permits on file
- Aug 13, 2003
- last permit issued
- Feb 9, 2018
- completed
- 0
- cumulative oil, bbl
- 1.09M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 9, 2018
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pioneer G-14-199125 | Parsell (Morrow, Lower) | BE Anadarko II, LLC | 1 | 0 | 1.09M | Nov 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Range Production CompanyNov 2003 → Jun 2014
- 2Range Production Company, LLCJul 2014 → Dec 2017
- 3Winright Resources Operating,llcJan 2018 → Jan 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 535038-99 | Drill | Range Production Company | Aug 7, 2003 | Aug 13, 2003 | Sep 12, 2003 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-199125 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,760 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,028 | 11,048 | Perforated |
| 11,232 | 11,248 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,643 | 12.25 | 1,900 S |
| 7 | 9,893 | 8.75 | 460 S |
| 4.5 | 11,410 | 6.125 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 15, 2018 | Mar 15, 2018 | — |
| 00 | Mar 11, 2004 | Jan 2, 2004 | Yes |
| 00 | Feb 13, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-31581 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-31581 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39331581, documented in the API reference.