WELL · 42-393-31628 · DISTRICT 10

Courson Ranch 135 #7

Y

Roberts County · Lips (Mississippian) field · Shut IN  · Vertical

Courson Ranch 135 #7 (API 42-393-31628) is a well in Roberts County operated by Latigo Petroleum LLC, completed October 22, 2004 and listed as shut in on the RRC schedule.

The RRC has issued 2 drilling permits between 2004 and 2006, permitted to 11,040 ft.

It was permitted by Latigo Petroleum Texas, LP and has since transferred to Latigo Petroleum LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Morrow, Chester, St Louis, Hunton.

Its 2 leases have reported 3.69K barrels of oil and 420K mcf of gas since October 2004, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Latigo Petroleum LLC

Permitted by Latigo Petroleum Texas, LP; the EWA schedule now lists a different operator.

Pampa, TX · P-5 Y, filed May 4, 2026 · 76 permits on file · (432) 550-2320

SOURCE · RRC EWA WELLBORE SCHEDULE

11,040
total depth, ft
2
permits on file
Feb 13, 2006
last permit issued
Oct 22, 2004
completed
3.69K
cumulative oil, bbl
420K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 22, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Courson Ranch 135 G-14-214526Pan Petro (Cleveland)Latigo Petroleum, LLC10404KOct 2005 – Jul 2026
Courson Ranch 135 O-14-7574Lips (Mississippian)Latigo Petroleum, LLC13.69K16KOct 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 5,687 · prior 12 4,627(+23%)

05001K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Latigo Petroleum Texas, LPOct 2004 → Feb 2009
  2. 2Latigo Petroleum, Inc.Mar 2009 → Aug 2011
  3. 3Plains Exploration & Prod. Co.Sep 2011 → Jul 2013
  4. 4Latigo Petroleum, LLCAug 2013 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
614050-99RecompletionLatigo Petroleum Texas, LPFeb 13, 2006Feb 13, 2006—11,040
547739-99DrillLatigo Petroleum Texas, LPJul 1, 2004Jul 12, 2004Jul 22, 200411,040

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-214526————
—— O-14-7574————

Formation tops

As filed on W-2/G-1. Subsea from 2,790 ft elevation.Download CSV →

FormationMD ftSubsea
Morrow7,995-5,205
Chester8,505-5,715
St Louis8,580-5,790
Hunton9,670-6,880
Viola9,840-7,050
Simpson10,350-7,560
EllenburgerELLENBERGER10,475-7,685

Perforations

Perforated and open-hole intervals.

FromToType
6,8506,884Perforated
8,7508,835Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,63511650 S
5.511,030—25 S
5.511,0307.875385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 26, 2006Feb 17, 2006—
00Mar 13, 2006——
00Feb 13, 2006Sep 15, 2005—
00Oct 14, 2005Apr 28, 2005Yes
00Aug 11, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331628, documented in the API reference.