WELL · 42-393-32174 · DISTRICT 10
N McMordie 127 #2
Roberts County · St. Clair (Granite Wash) field · Producing · Vertical
N Mcmordie 127 #2 (API 42-393-32174) is a well in Roberts County operated by Texakoma E & P LLC, completed December 5, 2008 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 15, 2008, permitted to 10,500 ft.
It was permitted by Texakoma Operating, L.P. and has since transferred to Texakoma E & P LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Brown Dolomite, Granite Wash, Atoka.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Texakoma Operating, L.P.; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Aug 4, 2025 · 102 permits on file · (817) 709-0509
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texakoma E & P LLC |
| Production reports | Texakoma E & P, LLCthrough Mar 2026 |
| Latest permit | Texakoma Operating, L.P.Sep 15, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 1
- permits on file
- Sep 15, 2008
- last permit issued
- Dec 5, 2008
- completed
- 0
- cumulative oil, bbl
- 1M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 5, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| N McMordie 127 G-14-246653 | St. Clair (Granite Wash) | Texakoma E & P, LLC | 1 | 0 | 1M | Dec 2008 – Jul 2026 |
Gas, mcf lease total
Last 12 months 20,744 · prior 12 23,928(-13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texakoma Operating, L.P.Dec 2008 → Sep 2024
- 2Texakoma E & P, LLCOct 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 669977-99 | Drill | Texakoma Operating, L.P. | Aug 27, 2008 | Sep 15, 2008 | Oct 16, 2008 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-246653 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,781 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,950 | -1,169 |
| Granite Wash | 8,550 | -5,769 |
| Atoka | 9,600 | -6,819 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,064 | 9,078 | Perforated |
| 9,172 | 9,186 | Perforated |
| 9,360 | 9,372 | Perforated |
| 9,428 | 9,492 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,416 | 12.25 | 1,650 S |
| 4.5 | 9,782 | 7.875 | 590 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 2009 | Jan 15, 2009 | Yes |
| 00 | Apr 28, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-32174 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-32174 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.