WELL · 42-393-32222 · DISTRICT 10
Morrison #1183A
Roberts County · Morrison Ranch (Morrow Up.) field · Producing · Vertical
Morrison #1183A (API 42-393-32222) is a well in Roberts County operated by Davis Operating Company Inc., completed July 5, 2009 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2009 and 2012, permitted to 10,000 ft.
Completion filings report 4 formation tops, including Pennsylvanian, Cleveland, Oswego, Morrow.
No lease production has been reported under this well’s leases.
Operator of record
Tulsa, OK · P-5 Y, filed Apr 4, 2026 · 57 permits on file · (877) 566-8034
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Davis Operating Company Inc. |
| Production reports | Davis Operating Company, Inc.through Nov 2025 |
| Latest permit | Davis Operating Company, Inc.Nov 13, 2012 |
- 10,000
- total depth, ft
- 2
- permits on file
- Nov 13, 2012
- last permit issued
- Jul 5, 2009
- completed
- 0
- cumulative oil, bbl
- 1.88M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 5, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morrison G-14-256472 | Morrison Ranch (Morrow Up. 9470) | Davis Operating Company, Inc. | 1 | 0 | 1.88M | Jul 2009 – Jul 2026 |
Gas, mcf lease total
Last 12 months 27,497 · prior 12 54,908(-50%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Davis Operating Company, Inc.Jul 2009 → Nov 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 751282-99 | Field transfer | Davis Operating Company, Inc. | Nov 9, 2012 | Nov 13, 2012 | Mar 14, 2009 | 10,000 |
| 678766-99 | Drill | Davis Operating Company, Inc. | Feb 20, 2009 | Feb 24, 2009 | Mar 12, 2009 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-256472 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,495 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PennsylvanianPENN SHALE | 4,800 | -2,305 |
| Cleveland | 7,516 | -5,021 |
| Oswego | 8,108 | -5,613 |
| MorrowMORROW GAS | 9,500 | -7,005 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,516 | 9,528 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 100 | — | — |
| 8.625 | 1,614 | 12.25 | 800 S |
| 5.5 | 9,690 | 7.875 | 410 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 5, 2013 | Nov 16, 2012 | Yes |
| 00 | Aug 11, 2010 | Mar 30, 2010 | Yes |
| 00 | Jul 8, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-32222 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-32222 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39332222, documented in the API reference.