WELL · 42-393-32444 · DISTRICT 10

Morrison #7183

N

Roberts County · Morrison Ranch (Oswego 8200) field  · Vertical

Morrison #7183 (API 42-393-32444) is a well in Roberts County operated by Davis Operating Company Inc., completed February 18, 2013.

The RRC has issued 2 drilling permits (amended once) between 2012 and 2015, permitted to 10,800 ft.

Completion filings report 3 formation tops, including Big Lime, Oswego, Morrow.

Its 2 leases have reported 27.2K barrels of oil and 88.8K mcf of gas since October 2005, last reporting in July 2026. The leases carry 14 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Davis Operating Company Inc.

Tulsa, OK · P-5 Y, filed Apr 4, 2026 · 57 permits on file · (877) 566-8034

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDavis Operating Company Inc.
Production reportsDavis Operating Company, Inc.through Nov 2019
Latest permitDavis Operating Company, Inc.Jul 9, 2015
10,800
total depth, ft
3
permits on file
Jul 9, 2015
last permit issued
Feb 18, 2013
completed
27.2K
cumulative oil, bbl
88.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 18, 2013
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison O-14-7665Morrison Ranch (Oswego 8200)Davis Operating Company, Inc.512.4K68.9KAug 2006 – Jul 2026
Morrison O-14-7668Morrison Ranch (Morrow Up. 9470)Davis Operating Company, Inc.914.8K20KOct 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Davis Operating Company, Inc.Dec 2005 → Nov 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
807976-99RecompletionDavis Operating Company, Inc.Jun 30, 2015Jul 9, 2015Jul 1, 201510,766
739430-98DrillDavis Operating Company, Inc.Sep 4, 2012May 10, 2012May 18, 201210,800
739430-99DrillDavis Operating Company, Inc.Apr 30, 2012May 10, 2012May 18, 201210,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-7665————
—— O-14-7668————

Formation tops

As filed on W-2/G-1. Subsea from 2,513 ft elevation.Download CSV →

FormationMD ftSubsea
Big Lime7,984-5,471
Oswego8,086-5,573
MorrowUPPER MORROW9,349-6,836

Perforations

Perforated and open-hole intervals.

FromToType
8,0858,126Perforated
8,0888,126Perforated
9,3509,369Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,58012.25755 S
710,6788.75231 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 28, 2015Aug 28, 2015—
00Jun 11, 2015Mar 11, 2015Yes
00Jul 24, 2014Sep 10, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
287K
bbl, all reported
May 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000106128H-1 InjectionActive2,0002,5008,344–9,370

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 3,716(-100%)

01K2K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39332444, documented in the API reference.