WELL · 42-393-32637 · DISTRICT 10

McMordie 84 #13H

Y

Roberts County · St. Clair (Granite Wash) field · Producing  · Horizontal

Mcmordie 84 #13H (API 42-393-32637) is a horizontal well in Roberts County operated by Texakoma E & P LLC, completed December 24, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 12, 2014, permitted to 10,200 ft.

Completion filings report 10 formation tops, including Brown Dolomite, Albany Dolomite - H2s Corrosive, Council Grove, Douglas.

No lease production has been reported under this well’s leases.

Operator of record

Texakoma E & P LLC

Plano, TX · P-5 Y, filed Aug 4, 2025 · 102 permits on file · (817) 709-0509

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexakoma E & P LLC
Production reportsTexakoma E & P, LLCthrough Mar 2026
Latest permitTexakoma E & P, LLCSep 12, 2014
10,200
total depth, ft
1
permits on file
Sep 12, 2014
last permit issued
Dec 24, 2014
completed
0
cumulative oil, bbl
1.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 24, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McMordie 84 G-14-279754St. Clair (Granite Wash)Texakoma E & P, LLC101.03MDec 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 29,250 · prior 12 34,519(-15%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texakoma E & P, LLCDec 2014 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
792775-99DrillTexakoma E & P, LLCJul 29, 2014Sep 12, 2014Sep 30, 201410,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-279754————

Formation tops

As filed on W-2/G-1. Subsea from 2,750 ft elevation.Download CSV →

FormationMD ftSubsea
Brown DolomiteBROWN DOLOMITE - PRODUCTIVE; H2S3,920-1,170
Albany Dolomite - H2S Corrosive——
Council Grove——
Douglas——
Lecompton (Douglas) - H2S Corros——
Moore County LimeMOORE COUNTY LIME - H2S CORROSIV——
Quinduno Brown Dolomite - H2S Co——
Tonkawa——
Toronto——
WolfcampWOLFCAMP - H2S CORROSIVE——

Perforations

Perforated and open-hole intervals.

FromToType
9,7609,762Perforated
9,9009,902Perforated
9,9959,997Perforated
10,09510,097Perforated
10,19010,192Perforated
10,28510,287Perforated
10,38010,382Perforated
10,49010,492Perforated
10,58510,587Perforated
10,68010,682Perforated
10,77510,777Perforated
10,87010,872Perforated
10,97010,972Perforated
11,11011,112Perforated
11,20511,207Perforated
11,30011,302Perforated
11,39511,397Perforated
11,49011,492Perforated
11,58511,587Perforated
11,68011,682Perforated
11,77511,777Perforated
11,87011,872Perforated
11,97011,972Perforated
12,06512,067Perforated
12,18512,187Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,10017.51,190 S
9.6255,49012.25600 S
79,8628.75340 S
4.513,5636.125555 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 28, 2016Jun 2, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39332637, documented in the API reference.