WELL · 42-393-32666 · DISTRICT 10

McMordie 13 #2H

Y

Roberts County · St. Clair (Granite Wash) field · Producing  · Horizontal

Mcmordie 13 #2H (API 42-393-32666) is a horizontal well in Roberts County operated by Texakoma E & P LLC, completed May 23, 2016 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 9, 2014, permitted to 9,600 ft.

Completion filings report 10 formation tops, including Douglas, Albany Dolomite - H2s Corrosive, Brown Dolomite, Council Grove.

No lease production has been reported under this well’s leases.

Operator of record

Texakoma E & P LLC

Plano, TX · P-5 Y, filed Aug 4, 2025 · 102 permits on file · (817) 709-0509

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexakoma E & P LLC
Production reportsTexakoma E & P, LLCthrough Apr 2026
Latest permitTexakoma E & P, LLCDec 9, 2014
9,600
total depth, ft
1
permits on file
Dec 9, 2014
last permit issued
May 23, 2016
completed
0
cumulative oil, bbl
1.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 23, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McMordie 13 G-14-281226St. Clair (Granite Wash)Texakoma E & P, LLC101.97MMay 2016 – Jul 2026

Gas, mcf lease total

Last 12 months 74,652 · prior 12 78,691(-5%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texakoma E & P, LLCMay 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
801348-99DrillTexakoma E & P, LLCDec 8, 2014Dec 9, 2014Feb 8, 20169,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-281226————

Formation tops

As filed on W-2/G-1. Subsea from 2,583 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas6,400-3,817
Albany Dolomite - H2S Corrosive——
Brown DolomiteBROWN DOLOMITE - PRODUCTIVE; H2S——
Council Grove——
Lecompton (Douglas) - H2S Corros——
Moore County LimeMOORE COUNTY LIME - H2S CORROSIV——
Quinduno Brown Dolomite - H2S Co——
Tonkawa——
Toronto——
WolfcampWOLFCAMP - H2S CORROSIVE——

Perforations

Perforated and open-hole intervals.

FromToType
10,00610,008Perforated
10,09610,098Perforated
10,19610,198Perforated
10,28210,284Perforated
10,37210,374Perforated
10,46610,468Perforated
10,54410,546Perforated
10,69010,692Perforated
10,83410,836Perforated
10,91010,912Perforated
11,02411,026Perforated
11,10411,106Perforated
11,20411,206Perforated
11,28411,286Perforated
11,37611,378Perforated
11,45611,458Perforated
11,54211,544Perforated
11,63011,632Perforated
11,72011,722Perforated
11,80411,806Perforated
11,90011,902Perforated
12,07012,072Perforated
12,22812,230Perforated
12,34412,346Perforated
12,63012,632Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,09917.51,330 S
9.6255,45512.25570 S
79,9698.75395 S
4.514,4656.125585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 8, 2016Aug 4, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39332666, documented in the API reference.