WELL · 42-395-30255 · DISTRICT 5
Beal Estate #1
Robertson County · Bald Prairie (Travis Peak) field · Vertical
Beal Estate #1 (API 42-395-30255) is a plugged well in Robertson County, plugged May 20, 2012, last operated by Xto Energy Inc..
The RRC has issued 2 drilling permits (amended once) between 1981 and 2002, permitted to 13,300 ft.
Operator of record
Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | none |
| Latest permit | XTO Energy Inc.Oct 17, 2002 |
- 13,300
- total depth, ft
- 3
- permits on file
- Oct 17, 2002
- last permit issued
- Jun 17, 2003
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 17, 2003
- Shut in
- —
- Plugged
- May 20, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beal Estate G-5-195492 | Bald Prairie (Travis Peak) | XTO Energy Inc. | 1 | 0 | 0 | Jun 2003 – May 2012 |
| Beal Estate G-5-99211 | Bald Prairie (CV-Lime) | Pg&e Resources Company | 1 | 0 | 0 | Jan 1993 – Aug 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 524586-98 | Reenter | XTO Energy Inc. | Jul 3, 2003 | Oct 17, 2002 | Jun 7, 2003 | 3,000 |
| 524586-99 | Reenter | XTO Energy Inc. | Oct 14, 2002 | Oct 17, 2002 | — | 3,000 |
| 132091-99 | Drill | Wessely Energy Corporation | Sep 3, 1981 | Sep 3, 1981 | Sep 23, 1981 | 13,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-99211 | — | — | — | — |
| — | — G-5-195492 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,307 | 2,336 | Perforated |
| 12,914 | 12,951 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 2,303 | 8.75 | 248 S |
| 9.625 | 5,030 | 12.25 | 1,980 S |
| 7 | 12,500 | 8.75 | 1,420 S |
| 2.875 | 12,800 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 2003 | Jul 7, 2003 | — |
| 00 | Jul 21, 2003 | — | — |
| 00 | Jan 12, 1984 | Apr 19, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-30255 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-30255 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 49.8K
- bbl, all reported
- Nov 2011
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000093080 | W-14 Disposal | Plugged May 31, 2012 | 8,500 | 600 | 2,300–2,360 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39530255, documented in the API reference.