WELL · 42-395-30387 · DISTRICT 3

Hancock #3

N

Robertson County · Kurten (Austin Chalk) field  · Horizontal · Sidetrack

Hancock #3 (API 42-395-30387) is a horizontal well in Robertson County operated by Northfield Enterprises Inc., completed July 15, 1992.

The RRC has issued 2 drilling permits (amended 3 times) between 1992 and 2002, permitted to 11,500 ft.

Completion filings report one formation top, including Austin Chalk.

Its 2 leases have reported 93.2K barrels of oil and 46.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Northfield Enterprises Inc.

Bryan, TX · P-5 Y, filed Oct 4, 2025 · 96 permits on file · (979) 776-6031

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorthfield Enterprises Inc.
Production reportsNorthfield Enterprises, Inc.through Apr 2026
Latest permitNorthfield Enterprises, Inc.Oct 2, 2002
11,500
total depth, ft
5
permits on file
Oct 2, 2002
last permit issued
Jul 15, 1992
completed
93.2K
cumulative oil, bbl
46.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 15, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Spring Valley Ranch C O-3-24477Giddings (Austin Chalk-3)Northfield Enterprises, Inc.179.7K44.1KNov 2002 – Jul 2026
Hancock O-3-21840Kurten (Austin Chalk)Northfield Enterprises, Inc.113.5K2.03KJan 1993 – Mar 2004

Oil, barrels lease total

Last 12 months 947 · prior 12 1,081(-12%)

0100200202420252026

Gas, mcf lease total

Last 12 months 9 · prior 12 0

0246202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Northfield EnterprisesMar 1993 → Nov 1993
  2. 2Northfield Enterprises, Inc.Sep 1994 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
524219-98Recompletion · sidetrackNorthfield Enterprises, Inc.Oct 25, 2002Oct 2, 2002Oct 2, 20028,000
524219-99Recompletion · sidetrackNorthfield Enterprises, Inc.Sep 30, 2002Oct 2, 2002—8,000
398593-97DrillNorthfield EnterprisesAug 17, 1992May 7, 1992Jun 1, 199211,150
398593-98DrillNorthfield EnterprisesJun 29, 1992May 7, 1992—11,150
398593-99DrillNorthfield EnterprisesApr 21, 1992May 7, 1992—11,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-21840————
—— O-3-24477————

Formation tops

As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,950-6,588

Perforations

Perforated and open-hole intervals.

FromToType
6,9508,685Perforated
7,0007,504Perforated
7,0009,964Perforated
7,00011,252Perforated
7,00012,654Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,17612.25230 S
5.57,6917.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2004Apr 16, 2003Yes
00Jan 21, 2004Sep 3, 1992Yes
00Jan 20, 1993Sep 3, 1992Yes
00Jan 8, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530387, documented in the API reference.