WELL · 42-395-30431 · DISTRICT 5
Peiskee #1
Robertson County · Mineral Pond (Travis Peak) field · Vertical
Peiskee #1 (API 42-395-30431) is a plugged well in Robertson County, plugged January 11, 2000, last operated by Marathon Oil Company.
The RRC has issued 2 drilling permits between 1995 and 1998, permitted to 16,500 ft.
Completion filings report 5 formation tops, including Buda, Rodessa, Pettit, Travis Peak.
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 2026 · 3,707 permits on file · (800) 332-9449
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marathon Oil Company |
| Production reports | Marathon Oil Companythrough Nov 1998 |
| Latest permit | Marathon Oil CompanyMar 24, 1998 |
- 16,500
- total depth, ft
- 2
- permits on file
- Mar 24, 1998
- last permit issued
- Jul 14, 1996
- completed
- 0
- cumulative oil, bbl
- 77.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jan 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 14, 1996
- Shut in
- —
- Plugged
- Jan 11, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Peiskee G-5-162562 | Wildcat | Marathon Oil Company | 1 | 0 | 29.1K | Jul 1996 – Jan 2000 |
| Peiskee G-5-167751 | Mineral Pond (Pettit) | Marathon Oil Company | 1 | 0 | 48.4K | Jan 1998 – Jan 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyApr 1997 → Nov 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 474664-99 | Recompletion | Marathon Oil Company | Mar 24, 1998 | Mar 24, 1998 | Jan 27, 1998 | 14,250 |
| 433609-99 | Drill | Marathon Oil Company | Mar 7, 1995 | Mar 14, 1995 | Nov 30, 1995 | 16,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-162562 | — | — | — | — |
| — | — G-5-167751 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 435 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buda | 5,325 | -4,890 |
| Rodessa | 7,256 | -6,821 |
| Pettit | 8,220 | -7,785 |
| Travis Peak | 8,600 | -8,165 |
| Cotton ValleyCOTTON VALLEY SD | 11,400 | -10,965 |
| Cotton ValleyCOTTON VALLEY LIME | 13,250 | -12,815 |
| Cotton ValleyCOTTON VALLEY LM | 13,250 | -12,815 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,331 | 8,357 | Perforated |
| 9,432 | 9,443 | Perforated |
| 10,317 | 10,393 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,526 | 17.5 | 2,130 S |
| 9.625 | 9,212 | 12.25 | 680 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1998 | Mar 13, 1998 | Yes |
| 00 | May 6, 1998 | — | — |
| 00 | Sep 22, 1997 | Jun 6, 1997 | — |
| 00 | May 7, 1997 | Oct 10, 1996 | Yes |
| 00 | Apr 29, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-30431 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-30431 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39530431, documented in the API reference.