WELL · 42-395-30465 · DISTRICT 5

No. 1 Beal Estate Gas Unit #5

Plugged

Robertson County · Bald Prairie (Travis Peak) field  · Vertical

NO. 1 Beal Estate Gas Unit #5 (API 42-395-30465) is a plugged well in Robertson County, plugged February 17, 2009, last operated by Xto Energy Inc..

The RRC has issued one drilling permit, issued June 5, 1996, permitted to 10,600 ft.

It was permitted by Enserch Exploration, Inc and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Rodessa, Pettit, Travis Peak.

Operator of record

XTO Energy Inc.

Permitted by Enserch Exploration, Inc; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Sep 2002
Latest permitEnserch Exploration, IncJun 5, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
1
permits on file
Jun 5, 1996
last permit issued
Jan 23, 2006
completed
0
cumulative oil, bbl
122K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Feb 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 23, 2006
Shut in
—
Plugged
Feb 17, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
No. 1 Beal Estate Gas Unit G-5-160368Bald Prairie (Travis Peak)XTO Energy Inc.10122KOct 1996 – Feb 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enserch Exploration, IncOct 1996 → Mar 1998
  2. 2Eex CorporationApr 1998 → Apr 1998
  3. 3Cross Timbers Operating CompanyMay 1998 → May 2001
  4. 4XTO Energy Inc.Jun 2001 → Sep 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
448954-99DrillEnserch Exploration, IncJun 5, 1996Jun 5, 1996Aug 11, 199610,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-160368————

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa7,112-6,734
Pettit8,036-7,658
Travis Peak8,360-7,982

Perforations

Perforated and open-hole intervals.

FromToType
8,8148,910Perforated
8,8149,748Perforated
9,6669,748Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,24011390 S
4.510,5007.8751,330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 3, 2006Jan 30, 2006—
00Nov 14, 1996Oct 18, 1996Yes
00Nov 5, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

772K
bbl, last 12 reported months
1.78M
bbl, all reported
Nov 2008
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095353W-14 DisposalPlugged Apr 10, 20099,0004,2008,400–10,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 771,921 · prior 12 584,718(+32%)

050K100K150K20072008

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.