WELL · 42-395-30486 · DISTRICT 5

Pollard Douglas F. #1

N

Robertson County · Wildcat field  · Directional

Pollard Douglas F. #1 (API 42-395-30486) is a permitted well in Robertson County filed by Anadarko Petroleum Corp.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1996 and 2001, permitted to 16,000 ft.

Completion filings report 7 formation tops, including Massive Anhydrite (marker), Rodessa, Pettit, Travis Peak.

Operator of record

Anadarko Petroleum Corporation

Houston, TX · P-5 Y, filed Apr 4, 2026 · 4,004 permits on file · (832) 636-1111

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko Petroleum Corporation
Production reportsDiversified Production LLCthrough Apr 2026
Latest permitAnadarko Petroleum Corp.Mar 14, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,000
total depth, ft
2
permits on file
Mar 14, 2001
last permit issued
—
completed
0
cumulative oil, bbl
696K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pollard, Douglas F. G-5-186139Reagan Ranch (Bossier Sand)Diversified Production LLC10696KJul 2001 – Jul 2026
Pollard, Douglas F. O-5-3558WildcatAnadarko Petroleum Corporation100Sep 1997 – Jan 2002

Gas, mcf lease total

Last 12 months 11,537 · prior 12 10,262(+12%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationJul 2001 → Mar 2013
  2. 2Anadarko E&P Onshore LLCApr 2013 → Jul 2015
  3. 3Legacy Reserves Operating LPAug 2015 → May 2022
  4. 4Diversified Production LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
506511-99RecompletionAnadarko Petroleum Corp.Mar 14, 2001Mar 14, 2001Mar 12, 200115,300
456288-99DrillZackson Resources, Inc.Dec 13, 1996Dec 17, 1996Dec 19, 199616,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-186139————
—— O-5-3558————

Formation tops

As filed on W-2/G-1. Subsea from 335 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE7,830-7,495
Rodessa8,050-7,715
PettitPETTET8,118-7,783
Travis Peak9,240-8,905
BossierBOSSIER FACIES12,835-12,500
Cotton ValleyCOTTON VALLEY LIME14,905-14,570
Cotton ValleyCOTTON VALLEY LIME14,965-14,630
Pinnacle Reef15,150-14,815

Perforations

Perforated and open-hole intervals.

FromToType
15,00415,008Perforated
15,08315,085Perforated
15,09315,095Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2080——
13.3752,51517.251,720 S
13.3752,51517.51,720 S
9.62511,64112.251,545 S
7.62514,0348.5570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 22, 2002Nov 8, 2001Yes
00Jan 2, 2002——
00Sep 30, 1997Jun 25, 1997Yes
00Sep 16, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530486, documented in the API reference.