WELL · 42-395-30500 · DISTRICT 5

Camp Cooley #2R

Y

Robertson County · Bohlwhite (Cotton Valley Lime) field · Producing  · Directional

Camp Cooley #2R (API 42-395-30500) is a well in Robertson County operated by Diversified Production LLC, completed September 18, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 9, 1997, permitted to 18,000 ft.

It was permitted by Broughton Operating Corp. and has since transferred to Diversified Production LLC on the wellbore schedule.

Completion filings report 3 formation tops, including T/Travis Peak, T/Bossier Sand, T/Cotton Valley Lime.

No lease production has been reported under this well’s leases.

Operator of record

Diversified Production LLC

Permitted by Broughton Operating Corp.; the EWA schedule now lists a different operator.

Keithville, LA · P-5 Y, filed Feb 4, 2026 · 11 permits on file · (844) 507-5540

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiversified Production LLC
Production reportsDiversified Production LLCthrough Apr 2026
Latest permitZackson Resources, Inc.Apr 9, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

18,000
total depth, ft
2
permits on file
Apr 9, 1997
last permit issued
Sep 18, 1997
completed
0
cumulative oil, bbl
52M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 18, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Camp Cooley G-5-166005Bohlwhite (Cotton Valley Lime)Diversified Production LLC1052MSep 1997 – Jul 2026

Gas, mcf lease total

Last 12 months 266,821 · prior 12 352,873(-24%)

020K40K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Broughton Operating Corp.Sep 1997 → Nov 2000
  2. 2Anadarko Petroleum CorporationDec 2000 → Mar 2013
  3. 3Anadarko E&P Onshore LLCApr 2013 → Jul 2015
  4. 4Legacy Reserves Operating LPAug 2015 → May 2022
  5. 5Diversified Production LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
460933-98DrillBroughton Operating Corp.Oct 20, 1997Apr 9, 1997—18,000
460933-99DrillZackson Resources, Inc.Apr 9, 1997Apr 9, 1997Apr 15, 199718,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-166005————

Formation tops

As filed on W-2/G-1. Subsea from 407 ft elevation.Download CSV →

FormationMD ftSubsea
T/Travis Peak9,425-9,018
T/Bossier Sand13,845-13,438
T/Cotton Valley Lime15,000-14,593

Perforations

Perforated and open-hole intervals.

FromToType
15,04015,452Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
208626230 S
13.3752,51917.51,830 S
7.759,5168.585 S
9.6259,90212.25930 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 5, 1998Oct 17, 1997Yes
00Jan 27, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530500, documented in the API reference.