WELL · 42-395-30534 · DISTRICT 3

Gopher Unit #1RE

N

Robertson County  · Horizontal · Sidetrack

Gopher Unit #1RE (API 42-395-30534) is a permitted horizontal well in Robertson County filed by Rme Petroleum Company; no completion report is on file yet.

The RRC has issued 4 drilling permits (amended twice) between 1997 and 2002, permitted to 7,650 ft.

Completion filings report 2 formation tops, including Austin Chalk, Georgetown.

Its lease has reported 148K barrels of oil and 104K mcf of gas since October 1997, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Rme Petroleum Company

Houston, TX · P-5 Y, filed Oct 5, 2018 · 512 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsWildfire Energy Operating LLCthrough Mar 2026
Latest permitRme Petroleum CompanyNov 20, 2002
7,650
total depth, ft
6
permits on file
Nov 20, 2002
last permit issued
—
completed
148K
cumulative oil, bbl
104K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gopher Unit O-3-23378Giddings (Buda)Wildfire Energy Operating LLC2148K104KOct 1997 – Jul 2026

Oil, barrels lease total

Last 12 months 2,557 · prior 12 3,442(-26%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 2,337 · prior 12 2,779(-16%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyOct 1997 → Nov 1999
  2. 2Anadarko E&P Company LPJan 2003 → Dec 2012
  3. 3Anadarko E&P Onshore LLCJan 2013 → Jun 2017
  4. 4Wildhorse Resources Mngt Co, LLCJul 2017 → May 2019
  5. 5Chesapeake Operating, L.L.C.Jun 2019 → Feb 2023
  6. 6Wildfire Energy Operating LLCMar 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
525696-98RecompletionRme Petroleum CompanyDec 19, 2002Nov 20, 2002Nov 29, 20027,650
525696-99RecompletionRme Petroleum CompanyNov 20, 2002Nov 20, 2002—7,650
525264-99RecompletionRme Petroleum CompanyNov 6, 2002Nov 6, 2002—7,650
475203-99Recompletion · sidetrackUnion Pacific Resources CompanyApr 10, 1998Apr 10, 1998—7,600
466615-98DrillUnion Pacific Resources CompanyOct 28, 1997Aug 22, 1997Sep 1, 19977,600
466615-99DrillUnion Pacific Resources CompanyAug 22, 1997Aug 22, 1997—7,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-23378————
—— O-3-23378————

Formation tops

As filed on W-2/G-1. Subsea from 297 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,426-6,129
Georgetown7,148-6,851
Georgetown7,210-6,913

Perforations

Perforated and open-hole intervals.

FromToType
6,42611,961Perforated
7,03013,400Perforated
7,05211,832Perforated
7,2027,376Perforated
7,2067,445Perforated
7,30511,671Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7583514.75405 S
7.6257,0309.875280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 2003Sep 18, 2003—
00May 19, 2003Apr 24, 2003Yes
00May 8, 2003Oct 28, 1997Yes
00Jan 29, 1998Oct 28, 1997Yes
00Jan 26, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530534, documented in the API reference.