WELL · 42-395-30724 · DISTRICT 5

Martin #1 Gas Unit #8

WaterN

Robertson County · Bald Prairie (CV Consolidated) field  · Directional

Martin #1 Gas Unit #8 (API 42-395-30724) is a well in Robertson County operated by Xto Energy Inc., completed October 12, 2002.

The RRC has issued 2 drilling permits (amended once) between 2002 and 2009, permitted to 13,600 ft.

Completion filings report 15 formation tops, including Georgetown, Paluxy, BMA, Pettit.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Jun 2009
Latest permitXTO Energy Inc.Aug 20, 2009
13,600
total depth, ft
3
permits on file
Aug 20, 2009
last permit issued
Oct 12, 2002
completed
0
cumulative oil, bbl
606K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 12, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Martin #1 Gas Unit G-5-254115Bald Prairie (Travis Peak)Hilcorp Energy Company100Jul 2009 – Jul 2026
Martin #1 Gas Unit G-5-191359Bald Prairie (CV Consolidated)XTO Energy Inc.10606KOct 2002 – Jun 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Oct 2002 → Jun 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
684135-99RecompletionXTO Energy Inc.Aug 13, 2009Aug 20, 2009Jun 25, 200912,940
517427-98DrillXTO Energy Inc.Mar 26, 2002Feb 11, 2002Aug 1, 200213,600
517427-99DrillXTO Energy Inc.Feb 7, 2002Feb 11, 2002—13,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-191359————
—— G-5-254115————

Formation tops

As filed on W-2/G-1. Subsea from 376 ft elevation.Download CSV →

FormationMD ftSubsea
Georgetown5,104-4,728
Paluxy5,959-5,583
BMA7,254-6,878
Pettit7,254-6,878
BMA7,315-6,939
Travis Peak7,887-7,511
PettitPETTET7,962-7,586
Pettit8,023-7,647
Travis Peak8,253-7,877
TV PK8,314-7,938
Knowles10,837-10,461
Knowles10,899-10,523
Bossier11,183-10,807
Bossier11,246-10,870
Cotton Valley12,289-11,913
CV Lime12,747-12,371
Knowles18,037-17,661
Austin Chalk——
Buda——
EdwardsEDWARDS - DISPOSAL; KURTEN BUDA——
Nacatoch——
Woodbine——

Perforations

Perforated and open-hole intervals.

FromToType
8,45610,184Perforated
11,00512,867Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,15412.251,315 S
711,2808.751,120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 9, 2026Jan 28, 2026—
00Jan 3, 2025Dec 19, 2024—
00Apr 9, 2021Apr 8, 2021—
00Apr 14, 2020Jan 21, 2020—
00Nov 20, 2019Feb 12, 2019—
00Mar 3, 2010Jan 4, 2010—
00Jan 21, 2010——
00Jan 2, 2003Oct 22, 2002Yes
00Nov 14, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
13.9M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100790H-1 InjectionActive15,0003,5507,100–10,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 639,984(-100%)

050K100K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530724, documented in the API reference.