WELL · 42-395-31049 · DISTRICT 5

Law Unit #4

Y

Robertson County · Bald Prairie (CV Consolidated) field · Producing  · Vertical

Law Unit #4 (API 42-395-31049) is a well in Robertson County operated by Corsa Resources LLC, completed December 12, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 8, 2005, permitted to 14,600 ft.

It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Corsa Resources LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Austin Chalk, Buda, Glen Rose, Massive Anhydrite (marker).

No lease production has been reported under this well’s leases.

Operator of record

Corsa Resources LLC

Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.

Kemah, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (281) 636-2078

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCorsa Resources LLC
Production reportsCorsa Resources, LLCthrough Jan 2026
Latest permitEncana Oil & Gas(usa) Inc.Aug 8, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,600
total depth, ft
1
permits on file
Aug 8, 2005
last permit issued
Dec 12, 2005
completed
0
cumulative oil, bbl
3.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Law Unit G-5-217773Bald Prairie (CV Consolidated)Corsa Resources, LLC103.17MDec 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 7,419 · prior 12 68,847(-89%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encana Oil & Gas(usa) Inc.Dec 2005 → Apr 2009
  2. 2Fortson Oil CompanyAug 2010 → Jun 2020
  3. 3CRD Operating, LLCJul 2020 → Feb 2021
  4. 4Crescent Pass Energy, LLCMar 2021 → Aug 2024
  5. 5Diversified Production LLCSep 2024 → Nov 2025
  6. 6Corsa Resources, LLCJan 2026 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
604368-99DrillEncana Oil & Gas(usa) Inc.Aug 3, 2005Aug 8, 2005Oct 15, 200514,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-217773————

Formation tops

As filed on W-2/G-1. Subsea from 493 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk4,569-4,076
Buda5,374-4,881
Glen RoseGLENROSE6,495-6,002
Massive Anhydrite (marker)MASSIVE ANHYDRITE7,559-7,066
Pettit8,236-7,743
Travis Peak8,494-8,001
Knowles Lime11,388-10,895
BossierBOSSIER SHALE11,742-11,249
Cotton ValleyCOTTON VALLEY LIME13,224-12,731

Perforations

Perforated and open-hole intervals.

FromToType
13,33713,343Perforated
13,40513,411Perforated
13,65013,660Perforated
13,95813,966Perforated
14,03714,041Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,50012.25854 S
713,0108.75740 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 2006Jan 30, 2006Yes
00Aug 7, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.