WELL · 42-395-31507 · DISTRICT 5
Neyland #1
Robertson County · Bear Grass (Cotton Valley Cons) field · Directional
Neyland #1 (API 42-395-31507) is a plugged well in Robertson County, plugged March 13, 2017, last operated by Cci Gulf Coast Upstream LLC.
The RRC has issued one drilling permit, issued August 19, 2008, permitted to 14,500 ft.
It was permitted by Red Willow Production, LLC and has since transferred to Cci Gulf Coast Upstream LLC on the wellbore schedule.
Completion filings report 4 formation tops, including James Lime, Travis Peak, Cotton Valley, Last Bossier Sand (Base).
Operator of record
Permitted by Red Willow Production, LLC; the EWA schedule now lists a different operator.
Teague, TX · P-5 Y, filed Feb 4, 2022 · 19 permits on file · (281) 460-5808
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cci Gulf Coast Upstream LLC |
| Production reports | Cci Gulf Coast Upstream LLCthrough Jan 2016 |
| Latest permit | Red Willow Production, LLCAug 19, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,500
- total depth, ft
- 1
- permits on file
- Aug 19, 2008
- last permit issued
- Nov 23, 2008
- completed
- 0
- cumulative oil, bbl
- 127K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Mar 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 23, 2008
- Shut in
- —
- Plugged
- Mar 13, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neyland G-5-246800 | Bear Grass (Cotton Valley Cons) | Cci Gulf Coast Upstream LLC | 1 | 0 | 127K | Nov 2008 – Mar 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Red Willow Production, LLCNov 2008 → Aug 2014
- 2Cci Gulf Coast Upstream LLCSep 2014 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 668165-99 | Drill | Red Willow Production, LLC | Aug 1, 2008 | Aug 19, 2008 | Aug 24, 2008 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-246800 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 363 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES LIMESTONE | 8,443 | -8,080 |
| Travis Peak | 9,018 | -8,655 |
| Cotton ValleyCOTTON VALLEY SANDSTONE | 11,604 | -11,241 |
| Last Bossier Sand (Base) | 13,120 | -12,757 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,076 | 13,083 | Perforated |
| 13,098 | 13,101 | Perforated |
| 13,112 | 13,117 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,387 | 12.25 | 1,570 S |
| 5.5 | 13,500 | 8.75 | 1,755 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 28, 2009 | Jan 20, 2009 | Yes |
| 00 | May 5, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-31507 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-31507 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.