WELL · 42-395-31535 · DISTRICT 5

Bear Creek #3

N

Robertson County · Bald Prairie (CV Consolidated) field  · Directional

Bear Creek #3 (API 42-395-31535) is a well in Robertson County operated by Cci Gulf Coast Upstream LLC, completed February 27, 2009.

The RRC has issued 2 drilling permits between 2008 and 2015, permitted to 17,000 ft.

Completion filings report 8 formation tops, including Glen Rose, Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Cci Gulf Coast Upstream LLC

Teague, TX · P-5 Y, filed Feb 4, 2022 · 19 permits on file · (281) 460-5808

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCci Gulf Coast Upstream LLC
Production reportsDiversified Production LLCthrough Apr 2026
Latest permitCci Gulf Coast Upstream LLCJul 23, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
2
permits on file
Jul 23, 2015
last permit issued
Feb 27, 2009
completed
0
cumulative oil, bbl
12.7M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 27, 2009
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bear Creek G-5-250789Bohlwhite (Cotton Valley Lime)Diversified Production LLC1012.7MFeb 2009 – Jul 2026
Bear Creek G-5-277839Bald Prairie (CV Consolidated)Cci Gulf Coast Upstream LLC100Oct 2013 – Aug 2015

Gas, mcf lease total

Last 12 months 188,178 · prior 12 127,937(+47%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Red Willow Production, LLCFeb 2009 → Aug 2014
  2. 2Cci Gulf Coast Upstream LLCSep 2014 → Jan 2021
  3. 3TGNR Gulf Coast LLCFeb 2021 → Oct 2021
  4. 4Crescent Pass Energy, LLCNov 2021 → Aug 2024
  5. 5Diversified Production LLCSep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
808414-99Field transferCci Gulf Coast Upstream LLCJul 14, 2015Jul 23, 2015Oct 20, 200817,000
670377-99DrillRed Willow Production, LLCSep 3, 2008Sep 23, 2008Oct 20, 200817,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-250789————
—— G-5-277839————

Formation tops

As filed on W-2/G-1. Subsea from 410 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose7,088-6,678
Glen Rose7,089-6,679
Rodessa8,095-7,685
Rodessa8,097-7,687
Pettit9,040-8,630
Travis Peak9,440-9,030
Cotton ValleyCOTTON VALLEY SAND12,100-11,690
Knowles Limestone12,725-12,315
Bossier13,120-12,710
CV Consolidated15,317-14,907
Cotton ValleyCOTTON VALLEY REEF15,325-14,915

Perforations

Perforated and open-hole intervals.

FromToType
15,69015,696Perforated
15,78615,790Perforated
15,81415,818Perforated
15,84215,850Perforated
15,96215,966Perforated
15,98015,984Perforated
16,06616,070Perforated
16,09216,096Perforated
16,19816,202Perforated
16,24816,264Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.8755,37012.251,155 S
7.7514,2588.5425 S
516,6046.5225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 18, 2015Sep 15, 2015—
00Oct 30, 2009Apr 23, 2009Yes
00Sep 10, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39531535, documented in the API reference.