WELL · 42-395-31707 · DISTRICT 5
FM 2096 SWD #1
Robertson County · Bald Prairie (Travis Peak) field · Temp Abandoned · Vertical
FM 2096 Swd #1 (API 42-395-31707) is a well in Robertson County operated by Hilcorp Energy Company, completed September 24, 2024 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued December 11, 2009, permitted to 8,000 ft.
It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including Austin Chalk, Buda, Georgetown.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit.
Operator of record
Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | none |
| Latest permit | XTO Energy Inc.Dec 11, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 1
- permits on file
- Dec 11, 2009
- last permit issued
- Sep 24, 2024
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 24, 2024
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| FM 2096 SWD G-5-260632 | Bald Prairie (Travis Peak) | Hilcorp Energy Company | 1 | 0 | 0 | May 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 688429-99 | Drill | XTO Energy Inc. | Dec 9, 2009 | Dec 11, 2009 | Nov 19, 2010 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-260632 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 411 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 4,315 | -3,904 |
| BudaBUDA LIMESTONE | 5,221 | -4,810 |
| Georgetown | 5,352 | -4,941 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,396 | 7,762 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,373 | 12.25 | 446 S |
| 7 | 8,000 | 8.75 | 1,137 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 2024 | Oct 17, 2024 | — |
| 00 | Aug 29, 2011 | May 3, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-31707 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-31707 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 7.18M
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000101652 | W-14 Disposal | Active | 15,000 | 3,500 | 7,000–8,000 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 83,981(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39531707, documented in the API reference.