WELL · 42-399-00170 · DISTRICT 7
Jennings SWD #1
Runnels County · Winters (Jennings Sand West) field · Vertical
Jennings Swd #1 (API 42-399-00170) is a plugged well in Runnels County, plugged September 21, 1992, last operated by Anderson James K. Inc..
The RRC has issued one drilling permit, issued February 24, 1987, permitted to 3,300 ft.
Operator of record
Abilene, TX · P-5 Y, filed Oct 4, 2025 · 335 permits on file · (325) 665-7408
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anderson James K. Inc. |
| Production reports | none |
| Latest permit | Anderson, James K. Inc.Feb 24, 1987 |
- 3,300
- total depth, ft
- 1
- permits on file
- Feb 24, 1987
- last permit issued
- Oct 23, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 23, 1987
- Shut in
- —
- Plugged
- Sep 21, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-9-12310 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 326985-99 | Reenter | Anderson, James K. Inc. | Feb 23, 1987 | Feb 24, 1987 | — | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-12310 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,137 | 3,162 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 20 | — | — |
| 8.625 | 110 | — | — |
| 4.5 | 3,215 | 7.875 | 625 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 13, 1987 | Oct 29, 1987 | — |
| 00 | Nov 10, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-00170 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-00170 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 3.71K
- bbl, last 12 reported months
- 63.6K
- bbl, all reported
- May 1992
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000064636 | W-14 Disposal | Plugged Oct 9, 1992 | 200 | 300 | 3,137–3,162 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 3,712 · prior 12 59,841(-94%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39900170, documented in the API reference.