WELL · 42-399-02408 · DISTRICT 7
Natalia #2WI
Runnels County · Norton N. (Gardner Sand) field · Vertical
Natalia #2WI (API 42-399-02408) is a plugged well in Runnels County, plugged February 24, 2009, last operated by Enrich Oil Corporation.
The RRC has issued one drilling permit (amended once), issued January 31, 2006, permitted to 5,700 ft.
Its lease has reported 551 barrels of oil and 1.63K mcf of gas since March 2006, last reporting in March 2009. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Jan 4, 2026 · 529 permits on file · (325) 668-3812
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enrich Oil Corporation |
| Production reports | Enrich Oil Corporationthrough May 2006 |
| Latest permit | Enrich Oil CorporationJan 31, 2006 |
- 5,700
- total depth, ft
- 2
- permits on file
- Jan 31, 2006
- last permit issued
- Jun 30, 2006
- completed
- 551
- cumulative oil, bbl
- 1.63K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Mar 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 30, 2006
- Shut in
- —
- Plugged
- Feb 24, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Natalia O-9-15909 | Norton, N. (Gardner Sand) | Enrich Oil Corporation | 2 | 551 | 1.63K | Mar 2006 – Mar 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enrich Oil CorporationMar 2006 → May 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 613164-98 | Reenter | Enrich Oil Corporation | Feb 28, 2006 | Jan 31, 2006 | May 2, 2006 | 5,700 |
| 613164-99 | Reenter | Enrich Oil Corporation | Jan 26, 2006 | Jan 31, 2006 | — | 5,105 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-15909 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,370 | 4,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 115 | 10.75 | 100 S |
| 4.5 | 4,623 | 7 | 150 S |
| 7 | 4,678 | 8.75 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 2007 | Jul 10, 2006 | — |
| 00 | Jan 22, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-02408 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-02408 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 18.5K
- bbl, last 12 reported months
- 33.3K
- bbl, all reported
- Mar 2008
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000096339 | H-1 Injection | Plugged Mar 11, 2009 | 5,000 | 2,000 | 4,355–4,410 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 18,450 · prior 12 14,800(+25%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39902408, documented in the API reference.