WELL · 42-399-10184 · DISTRICT 7
Evans Lucius S. #B-1
Runnels County · Motley North (Palo Pinto) field · Vertical
Evans Lucius S. #B-1 (API 42-399-10184) is a plugged well in Runnels County, plugged August 5, 1986, last operated by Dal-Petro Inc..
The RRC has issued one drilling permit, issued September 5, 1978, permitted to 4,650 ft.
Completion filings report 5 formation tops, including Valaro, Coleman Junction, Palo Pinto, Morris Lime.
Operator of record
Dallas, TX · P-5 Y, filed Apr 5, 1996 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dal-Petro Inc. |
| Production reports | none |
| Latest permit | Dal-Petro Inc.Sep 5, 1978 |
- 4,650
- total depth, ft
- 1
- permits on file
- Sep 5, 1978
- last permit issued
- Nov 15, 1978
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 15, 1978
- Shut in
- —
- Plugged
- Aug 5, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 31987-99 | Other | Dal-Petro Inc. | Oct 19, 1984 | Sep 5, 1978 | Nov 2, 1978 | 4,650 |
Formation tops
As filed on W-2/G-1. Subsea from 1,831 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Valaro | 1,485 | 346 |
| Coleman Junction | 1,590 | 241 |
| Coleman Junction | 1,840 | -9 |
| Palo Pinto | 3,810 | -1,979 |
| Morris Lime | 4,075 | -2,244 |
| Goen Lime | 4,320 | -2,489 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,845 | 3,849 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 211 | — | — |
| 2.875 | 4,330 | 6.75 | 250 S |
| 2.875 | 4,330 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 1985 | Sep 21, 1984 | — |
| 00 | Jul 4, 1985 | Sep 28, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-10184 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-10184 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39910184, documented in the API reference.