WELL · 42-399-30515 · DISTRICT 7

Anderson Ross -344- #2

Plugged

Runnels County · Dorman West (Jennings) field  · Vertical

Anderson Ross -344- #2 (API 42-399-30515) is a plugged well in Runnels County, plugged May 7, 1997, last operated by Fletcher E. B..

The RRC has issued one drilling permit, issued December 15, 1978, permitted to 4,760 ft.

Completion filings report 6 formation tops, including Coleman Junction, Palo Pinto, Upper Capps Lime, Lower Capps Lime.

Operator of record

Fletcher E. B.

Dallas, TX · P-5 Y, filed Feb 12, 1988 · 159 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFletcher E. B.
Production reportsnone
Latest permitFletcher, E. B.Dec 15, 1978
4,760
total depth, ft
1
permits on file
Dec 15, 1978
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 7, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Anderson, Ross -344- O-9-6866Dorman, West (Goen)Kaiser-Francis Oil Company100Jan 1993 – Jul 1997

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
38971-99RecompletionFletcher, E. B.Dec 15, 1978Dec 15, 1978Oct 24, 19784,760

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-6866————

Formation tops

As filed on W-2/G-1. Subsea from 1,932 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,720212
Palo Pinto4,040-2,108
Upper Capps Lime4,300-2,368
Lower Capps Lime4,440-2,508
Goen Lime4,510-2,578
Lower Jennings SD4,695-2,763

Perforations

Perforated and open-hole intervals.

FromToType
4,5524,572Perforated
4,698—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516311100 S
2.8754,5104.5125 S
2.3754,540——
4.54,7587.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 1987Jun 19, 1987—
00Jan 12, 1984Dec 5, 1978—
00Jan 12, 1984May 5, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

57.1K
bbl, last 12 reported months
2.17M
bbl, all reported
Mar 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000009649H-1 InjectionPlugged Jul 7, 19974003004,552–4,572

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 57,082 · prior 12 67,100(-15%)

05K10K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39930515, documented in the API reference.