WELL · 42-399-31694 · DISTRICT 7
Fuller #2
Runnels County · Henson (Morris) field · Vertical
Fuller #2 (API 42-399-31694) is a plugged well in Runnels County, plugged April 23, 1986, last operated by P D Petro Inc..
The RRC has issued 3 drilling permits between 1980 and 1984, permitted to 4,800 ft.
Completion filings report 4 formation tops, including Palo Pinto, Dog Bend, Jennings, Ellen.
Operator of record
Abilene, TX · P-5 Y, filed Jul 15, 1987 · 3 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | P D Petro Inc. |
| Production reports | none |
| Latest permit | P D Petro, Inc.Sep 12, 1984 |
- 4,800
- total depth, ft
- 3
- permits on file
- Sep 12, 1984
- last permit issued
- Nov 1, 1981
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 1, 1981
- Shut in
- —
- Plugged
- Apr 23, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 251641-99 | Recompletion | P D Petro, Inc. | Sep 10, 1984 | Sep 12, 1984 | — | 4,469 |
| 173257-99 | Recompletion | Tex-Star Petroleum | Sep 29, 1982 | Sep 29, 1982 | — | 3,510 |
| 89111-99 | Drill | Tex-Star Petroleum | Aug 8, 1980 | Aug 8, 1980 | Aug 12, 1980 | 4,800 |
Formation tops
As filed on W-2/G-1. Subsea from 1,930 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,208 | -1,278 |
| Dog Bend | 3,416 | -1,486 |
| Jennings | 3,599 | -1,669 |
| Ellen | 4,446 | -2,516 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,475 | 3,480 | Perforated |
| 4,416 | 4,418 | Perforated |
| 4,446 | 4,466 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 11 | 100 S |
| 2.375 | 3,440 | — | — |
| 2.375 | 4,470 | — | — |
| 4.5 | 4,583 | 7.875 | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 7, 1984 | Sep 21, 1984 | — |
| 00 | Oct 18, 1984 | Sep 2, 1984 | — |
| 00 | Jan 12, 1984 | Sep 22, 1982 | — |
| 00 | Jan 12, 1984 | Jan 2, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-31694 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-31694 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.