WELL · 42-399-31694 · DISTRICT 7

Fuller #2

Plugged

Runnels County · Henson (Morris) field  · Vertical

Fuller #2 (API 42-399-31694) is a plugged well in Runnels County, plugged April 23, 1986, last operated by P D Petro Inc..

The RRC has issued 3 drilling permits between 1980 and 1984, permitted to 4,800 ft.

Completion filings report 4 formation tops, including Palo Pinto, Dog Bend, Jennings, Ellen.

Operator of record

P D Petro Inc.

Abilene, TX · P-5 Y, filed Jul 15, 1987 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleP D Petro Inc.
Production reportsnone
Latest permitP D Petro, Inc.Sep 12, 1984
4,800
total depth, ft
3
permits on file
Sep 12, 1984
last permit issued
Nov 1, 1981
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1981
Shut in
—
Plugged
Apr 23, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
251641-99RecompletionP D Petro, Inc.Sep 10, 1984Sep 12, 1984—4,469
173257-99RecompletionTex-Star PetroleumSep 29, 1982Sep 29, 1982—3,510
89111-99DrillTex-Star PetroleumAug 8, 1980Aug 8, 1980Aug 12, 19804,800

Formation tops

As filed on W-2/G-1. Subsea from 1,930 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,208-1,278
Dog Bend3,416-1,486
Jennings3,599-1,669
Ellen4,446-2,516

Perforations

Perforated and open-hole intervals.

FromToType
3,4753,480Perforated
4,4164,418Perforated
4,4464,466Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510211100 S
2.3753,440——
2.3754,470——
4.54,5837.875575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 7, 1984Sep 21, 1984—
00Oct 18, 1984Sep 2, 1984—
00Jan 12, 1984Sep 22, 1982—
00Jan 12, 1984Jan 2, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39931694, documented in the API reference.