WELL · 42-399-32026 · DISTRICT 7

Rohmfeld #1

Plugged

Runnels County · Q. V. (Jennings) field  · Vertical

Rohmfeld #1 (API 42-399-32026) is a plugged well in Runnels County, plugged June 12, 1995, last operated by Walsh Resources Inc..

The RRC has issued 3 drilling permits between 1981 and 1992, permitted to 3,910 ft.

Completion filings report 8 formation tops, including King Sand, Serratt Sand, Palo Pinto, Base Lower Capps.

Its 2 leases have reported 190 barrels of oil and 2.31K mcf of gas since January 1993, last reporting in March 2003. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Walsh Resources Inc.

Tyler, TX · P-5 Y, filed Sep 4, 2025 · 49 permits on file · (903) 570-9872

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWalsh Resources Inc.
Production reportsWalsh Resources, Inc.through Jan 1995
Latest permitWalsh Resources, Inc.Jan 24, 1992
3,910
total depth, ft
3
permits on file
Jan 24, 1992
last permit issued
Feb 19, 1986
completed
190
cumulative oil, bbl
2.31K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 19, 1986
Shut in
—
Plugged
Jun 12, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Q. V. (Fry, Lower) Unit O-9-9021Q.V. (Fry, Lower)Walsh Resources, Inc.4851.36KJan 1993 – Mar 2003
Rohmfeld O-9-9523Q. V. (Jennings)Walsh Resources, Inc.2105943Jan 1993 – Aug 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Walsh Resources, Inc.Jan 1993 → Jan 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
395948-99RecompletionWalsh Resources, Inc.Jan 17, 1992Jan 24, 1992Feb 24, 19933,910
297359-99RecompletionWatco Energy, Inc.Feb 10, 1986Feb 10, 1986—3,910
120361-99DrillWalsh & Trant Petroleum Corp.Jun 9, 1981Jun 9, 1981—3,910

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-9021————
—— O-9-9523————

Formation tops

As filed on W-2/G-1. Subsea from 1,734 ft elevation.Download CSV →

FormationMD ftSubsea
King Sand2,160-426
Serratt Sand2,300-566
Palo Pinto3,200-1,466
Base Lower Capps3,615-1,881
Lower Fry3,660-1,926
Lower Fry Sand3,660-1,926
Jennings3,832-2,098
Jennings Sand3,832-2,098

Perforations

Perforated and open-hole intervals.

FromToType
3,6603,670Perforated
3,8343,840Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520011150 S
2.3753,611——
4.53,9107.875250 S
4.53,9137.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 30, 1993Mar 25, 1993Yes
00Apr 19, 1993Feb 24, 1986Yes
00Mar 11, 1986Feb 24, 1986Yes
00Mar 8, 1986——
00Jan 12, 1984Jul 20, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.95K
bbl, last 12 reported months
41.5K
bbl, all reported
May 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079756H-1 InjectionPlugged Jul 7, 19958001,5003,660–3,670

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,950 · prior 12 39,500(-95%)

02K4K6K19941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39932026, documented in the API reference.