WELL · 42-399-32414 · DISTRICT 7
Mayo B. L. #3
Runnels County · Joyce Ann (Lower Gardner) field · Vertical
Mayo B. L. #3 (API 42-399-32414) is a plugged well in Runnels County, plugged October 22, 1985, last operated by R & R Well Service.
The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 5,500 ft.
It was permitted by Black, Bob Operating and has since transferred to R & R Well Service on the wellbore schedule.
Completion filings report 6 formation tops, including Palo Pinto, Upper Capps Lime, Goen Lime, Jennings Sand.
Operator of record
Permitted by Black, Bob Operating; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 5, 2003 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R & R Well Service |
| Production reports | none |
| Latest permit | Black, Bob OperatingApr 22, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 2
- permits on file
- Apr 22, 1985
- last permit issued
- Apr 28, 1982
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 28, 1982
- Shut in
- —
- Plugged
- Oct 22, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 273331-99 | Recompletion | Black, Bob Operating | Apr 19, 1985 | Apr 22, 1985 | — | 4,886 |
| 154573-99 | Drill | Black, Bob Operating | Mar 25, 1982 | Mar 25, 1982 | Apr 2, 1982 | 5,500 |
Formation tops
As filed on W-2/G-1. Subsea from 1,904 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 4,048 | -2,144 |
| Upper Capps Lime | 4,338 | -2,434 |
| Goen Lime | 4,540 | -2,636 |
| Jennings Sand | 4,690 | -2,786 |
| Gardner Lime | 4,720 | -2,816 |
| Lower Gardner Sand | 4,844 | -2,940 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,543 | 4,551 | Perforated |
| 4,742 | 4,756 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 150 | 12.25 | 140 S |
| 2.375 | 4,710 | — | — |
| 4.5 | 4,886 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 1985 | Apr 19, 1985 | — |
| 00 | May 1, 1985 | — | — |
| 00 | Jan 12, 1984 | Jun 1, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-32414 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-32414 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39932414, documented in the API reference.