WELL · 42-399-32834 · DISTRICT 7

Smelley #3

Plugged

Runnels County  · Vertical

Smelley #3 (API 42-399-32834) is a plugged well in Runnels County, plugged November 1, 1989, last operated by Demco Exploration, Inc..

The RRC has issued 3 drilling permits (amended once) between 1983 and 1987, permitted to 5,000 ft.

Completion filings report 5 formation tops, including Palo Pinto, Dog Bend, Goen Lime, Jennings Sand.

Operator of record

Demco Exploration, Inc.

Abilene, TX · P-5 Y, filed Feb 15, 1990 · 18 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitDemco Exploration, Inc.Feb 19, 1987
5,000
total depth, ft
4
permits on file
Feb 19, 1987
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 1, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
326840-98ReenterDemco Exploration, Inc.Jul 21, 1987Feb 19, 1987—5,000
326840-99ReenterDemco Exploration, Inc.Feb 19, 1987Feb 19, 1987—5,000
290959-99OtherDemco Exploration, Inc.Nov 15, 1985Nov 25, 1985—5,000
203228-99DrillChallenger Energy CorporationJul 27, 1983Jul 27, 1983Jul 29, 19834,200

Formation tops

As filed on W-2/G-1. Subsea from 1,700 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO A3,381-1,681
Dog Bend3,510-1,810
Goen Lime3,874-2,174
Jennings Sand3,998-2,298
Gardner Lime4,068-2,368

Perforations

Perforated and open-hole intervals.

FromToType
3,3813,389Perforated
3,3903,399Perforated
3,4053,411Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251351190 S
4.54,1087.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 7, 1987Jul 7, 1987Yes
00Aug 1, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39932834, documented in the API reference.