WELL · 42-399-32903 · DISTRICT 7
Gray Betty J. #1
Runnels County · Nora East (Gardner Sand) field · Vertical
Gray Betty J. #1 (API 42-399-32903) is a plugged well in Runnels County, plugged May 20, 2010, last operated by Tkp Petroleum Inc..
The RRC has issued one drilling permit, issued September 13, 1983, permitted to 4,800 ft.
It was permitted by All-Southwest Petroleum, Inc. and has since transferred to Tkp Petroleum Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Palo Pinto, Upper Capps, Upper Fry, Goen Lime.
Operator of record
Permitted by All-Southwest Petroleum, Inc.; the EWA schedule now lists a different operator.
Lubbock, TX · P-5 Y, filed May 29, 2025 · 106 permits on file · (806) 543-0667
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TKP Petroleum Inc. |
| Production reports | TKP Petroleum, Inc.through Apr 1997 |
| Latest permit | All-Southwest Petroleum, Inc.Sep 13, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,800
- total depth, ft
- 1
- permits on file
- Sep 13, 1983
- last permit issued
- Jan 26, 1985
- completed
- 0
- cumulative oil, bbl
- 61.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 26, 1985
- Shut in
- —
- Plugged
- May 20, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gray, Betty J. G-9-114959 | Nora, East (Gardner Sand) | TKP Petroleum, Inc. | 1 | 0 | 61.6K | Jan 1993 – May 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1All-Southwest Petroleum, Inc.Jan 1993 → Jul 1996
- 2TKP Petroleum, Inc.Aug 1996 → Apr 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 211389-99 | Drill | All-Southwest Petroleum, Inc. | Dec 19, 1984 | Sep 13, 1983 | — | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-114959 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,765 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 3,250 | -1,485 |
| Upper Capps | 3,578 | -1,813 |
| Upper Fry | 3,686 | -1,921 |
| Goen Lime | 3,838 | -2,073 |
| Gardner Sand | 4,010 | -2,245 |
| Gardner Sand | 4,018 | -2,253 |
| Ellenburger | 4,420 | -2,655 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,021 | 4,029 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 177 | 11 | — |
| 4.5 | 4,625 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 1985 | Feb 20, 1985 | — |
| 00 | Mar 6, 1985 | Jan 30, 1985 | — |
| 00 | Jan 10, 1985 | Jul 12, 1984 | — |
| 00 | Jan 9, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-32903 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-32903 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39932903, documented in the API reference.