WELL · 42-399-32981 · DISTRICT 7
Briley #1
Runnels County · Vertical
Briley #1 (API 42-399-32981) is a plugged well in Runnels County, plugged November 10, 1983, last operated by 3-D Oil & Gas.
The RRC has issued 3 drilling permits between 1983 and 2007, permitted to 4,700 ft.
Completion filings report 4 formation tops, including Palo Pinto, Palo Pionto, U/Capps, B/Gardner Lime.
Its 2 leases have reported 3.05K barrels of oil since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Winters, TX · P-5 Y, filed Jul 4, 2026 · 10 permits on file · (325) 754-5628
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | 3-D Oil & Gasthrough Oct 2015 |
| Latest permit | 3-D Oil & GasJul 31, 2007 |
- 4,700
- total depth, ft
- 3
- permits on file
- Jul 31, 2007
- last permit issued
- —
- completed
- 3.05K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 10, 1983
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Briley O-9-16370 | Dick Richardson (Palo Pinto,li.) | 3-D Oil & Gas | 1 | 3.05K | 0 | Oct 2007 – Jul 2026 |
| Briley O-9-11534 | Dick Richardson (Palo Pinto,li.) | Petro-West Corporation | 1 | 0 | 0 | Jan 1993 – Apr 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 13-D Oil & GasOct 2007 → Oct 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 642774-99 | Reenter | 3-D Oil & Gas | Jul 18, 2007 | Jul 31, 2007 | Sep 24, 2007 | 4,430 |
| 279379-99 | Other | Petro-West Corporation | Jul 2, 1985 | Jul 2, 1985 | — | 4,430 |
| 216230-99 | Drill | West Texas Investments | Sep 30, 1983 | Sep 30, 1983 | Oct 7, 1983 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11534 | — | — | — | — |
| — | — O-9-16370 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,776 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,658 | -1,882 |
| Palo Pionto | 3,658 | -1,882 |
| U/Capps | 3,896 | -2,120 |
| B/Gardner Lime | 4,340 | -2,564 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,659 | 3,667 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 175 | 11 | 100 S |
| 4.5 | 4,430 | 7.875 | 650 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 3, 2008 | Nov 6, 2007 | Yes |
| 00 | Dec 3, 2007 | — | — |
| 00 | Sep 30, 1985 | Aug 30, 1985 | — |
| 00 | Sep 25, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-32981 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-32981 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39932981, documented in the API reference.